Loading...
ST9302-CS 990817TELEX 820590 TELEPHONE (214) 358-6581 FAX (21,4) 352-3201 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS. TEXAS 7S3S4-0787 DALLAS. TEXAS 75220 August 17, 1999 j Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Prqject .q: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: As discussed during our August 17, 1999 monthly meeting on the referenced project, the following information represents our understanding of the conduit crossings required by TU Electric prior to paving this project: 6" (Bore) 6" (Open) 2" (Open) STA 9+00 2x6" SCH 40 PVC 90 LF 220 LF STA 17+70 2x6" SCH 40 PVC 100 LF 160 LF STA 45+55 lx2" SCH 40 PVC 118 LF STA 49+72 lx2" SCH 40 PVC 120 LF STA 53+44 lx2" SCH 40 PVC 114 LF STA 55+85 2x6" SCH 40 PVC 90 LF 150 LF STA 76+54 2x6" SCH 40 PVC 296 LF STA 104+85 2x6" SCH 40 PVC 224 LF Totals 280 LF 1050 LF 352 LF Based upon these quantities and the previously submitted prices, the cost for these crossings is as follows: 6" SCH 40 PVC (open) 1050 LF at $8.00 per LF $8,400.00 6" SCH 40 PVC (bore) 280 LF at $24.00 per LF $6,720.00 2" SCH 40 PVC (open) 352 LF at $3.50 per LF $17232.00 Total $16,352.00 AN EQUAL OPPORTUNITY EMPLOYER Page 2 Sandy Lake Road Reconstruction Re: Prices for TU Electric Crossings This work will require an additional twelve (12) calendar days to complete. If you have any questions regarding this information, don't hesitate to contact our office. Sincerely, E~ ell, C nstm9 'on Company Robert D. Weber Project Engineer xc: Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803