Loading...
ST9302-CS 990817 (2)TELEX 820590 TELEPHONE (214) 358-6581 FAX (214) 352-3201 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 7E, 35~4-0787 DALLAS. TEXAS 75220 August 17, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell ~'4I 255 Parkway Blvd. ~xO lc~\"o0~ Coppell, Texas 75019-4409 ~ Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimlev-Horv Pr~ect #: 0694060rl DWU Project #: 98-311F Dear Mr. Griffin: The plans and specifications state that the 16" water line would be shut down for the water line adjustments and subsequent connections. Due to water usage, our utility subcontractor has been required to wet tap rather than dry tap the water line. The higher costs associated with these wet connections were not included in the bid items because of the note stating that the water line would be inactive. Please incorporate items for the following additional costs into the next change order: 1. 16" x 12" Connection $1,350.00 2. 16" x 8" Connection $700.00 3. 16" x 6" Connection $525.00 4. 16" x 4" Connection $775.00 5. t6" x 1" Connection $360.00 6. 16" x 2" Connection $370.00 During the development of these prices we have assumed that the City of Coppell will pay for the original bid items associated with this work and only pay for these additional items if our utility subcontractor is required to make an unplanned wet tap. Item #2., the 16" x 8" connection, is the only item listed abovc that is currently design, ated for utilization. The remaining items have been included for potential contingencies. If you have any questions regarding these prices, don't hesitate to contact our office. S0'tv~erely, ti Robert D. Weber Project Engineer xc. Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-.6803 AN EQUAL OPPORTUNITY EMPLOYER