Loading...
ST9302-CS 990409FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 April 9, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimlcy-Horn Projec.: #: 00940600 DWU Project #: 98-311F Dear Mr. Griffin: As requested, our utility subcontractor, M-Co Construction, has submitted a price breakdown to install temporary water services to allow the 16" water line to be lowered at several locations without a disruption in service to several businesses. The following prices apply to the temporary water services detailed on the January 25, 1999 Kimley-Hom drawings near STA 8+85 and STA 62+30: 1. Temporary 8" water service at STA 8+85 $5,412.50 8" DIP water line 50 LF $44.60 $2,230.00 water line $9.85 embedment $1.25 labor $13.59 equipment $5.67 labor burden $7.47 haul off $1.00 overhead/profit $5.77 fittings 1 LS $197.50 $197.50 8" gate valve 1 EA $750.00 $750.00 8"x8" tapping sleeve 1 EA $1,660.00 $1,660.00 tapping sleeve $500.00 embedment and blocking $20.00 labor $400.00 equipment $100.00 labor burden $220.00 tapping service $200.00 overhead/profit $220.00 AN EQUAL OPPORTUNITY EMPLOYER Page 2 Sandy Lake Road Reconstruction Re: Temporary Water Service Prices Pavement repair 9 SY $25.00 $225.00 Connect to existing service 1 EA $400.00 $350.00 2. Temporary 6" waterline extension and service at STA 62+30 $12,178.00 8"x6" tapping sleeve 1 EA $1,540.00 $1,540.00 tapping sleeve $400.00 embedment and blocking $20.00 labor $400.00 equipment $100.00 labor burden $220.00 tapping service $200.00 overhead/profit $200.00 6"x6" tapping sleeve 1 EA $1,487.00 $1,487.00 6" gate valve 2 EA $600.00 $1,200.00 6" DR-14 water line 235 LF $30.00 $7,050.00 water pipe $3.75 embedment $1.25 labor $10.59 equipment $3.67 labor burden $5.82 haul off $1.00 overhead/profit $3.92 Pavement repair 9 SY $25.00 $225.00 Driveway repair 8 SY $22.00 $176.00 Test water line 1 EA $500.00 $500.00 3. Water service and tap at STA 62+30 $2,709.50 1.75" wet tap 1 EA $934.50 $934.50 tap saddle & corp $175.00 labor $250.00 equipment $100.00 labor burden $137.50 tapping service $150.00 overhead/profit $122.00 Page 3 Sandy Lake Road Reconstruction Re: Temporary Water Service Prices 1.75" TY K copper service 60 LF $20.00 $1,200.00 copper tubing $4.00 labor $7.00 equipment $2.00 labor burden $3.85 haul off $0.50 overhead/profit $2.65 Pavement repair 9 SY $25.00 $225.00 Connect to existing service 1 EA $350.00 $350.00 As requested, we have reevaluated our prices for two additional 16" gate valves. The revised prices are as follows: 1. Cost to cut-in 16" gate valve on RCCP line at Kimble Kourt $11,500.00 2. Cost to cut-in 16" gate valve on DI pipe near STA 54+00 $8,200.00 Please add an additional twenty two (22) calendar days to the project's duration for the temporary services and the gate valves. If you have any questions regarding this issue, don't hesitate to contact our office. cerely, X~ C~s~ion Company Robert D. Weber Project Engineer xc: Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803