REINFORCING STEEL PLACEMENT
Report Date January 15, 1996 Test Date: January 5, 1996
client City of Coppell General Report No.: 10
Project 6.0 MG Water Storage Tank Project No.: 95-196
Identification Field Inspection of Reinforcing Steel
Method of Test Visual Inspection
Results
On January 5, 1996 a represemative of GEE Consultants, Inc. was present at the above
referenced project to perform reinforcing steel inspection:
Wall panels WD-2, WF-2
Dome Panels 2B-5, 2A-5, 6A-5, 1A-5, 3A-5, 4A-5, 5A-5, 3B-5, 4B-4, 5B-4, 6B-4,
3C-4, 6C-4, 4C-4, 5C-4, 6D-4, 5D-4, 4D-4, 5E-4, 6E-4, 6F-4
The following discrepancies were noted and called to the attention of Bob, a representative of Natgun.
Weld tabs mis-located at several locations
The above discrepancies were corrected as noted. ~
cc: Mr. Larry Davis - City of Coppell
Mr. Bob Barbarisi, Jr. - Natgun Corporation