Loading...
ST9302-CS 990215FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 February 15, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Horn Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: It is our understanding that the sanitary sewer work at STA 15+77.13, 18.06 Lt. has been modified to the following scope of work: 1. Remove the existing sanitary sewer manhole. 2. Reconnect the north to south 8" sanitary sewer line after removing the old manhole. 3. Plug the sanitary sewer line to the west of the old manhole. 4. Do not construct a new sanitary sewer manhole. Our contract with the City addresses all of the required items of work, except for reconnecting the sanitary sewer lines to the north and south of the old manhole. Our price for making this connection is $580.00 plus the applicable footage of sanitary sewer pipe necessary to make the connection. If you havc any qucstion$ regarding this issue, don't hcsitatc to contact our office. Sincerely, ~ Company io: tion Project Engineer xc: Michael G. DeMotte, Kimley-Horn and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER