ST9302-CS 990215FAX (214) 352-3201 TELEPHONE (214) 358-6581
ED BELL CONSTRUCTION COMPANY
POST OFFICE BOX 540787 10605 HARRY HINES
DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220
February 15, 1999
Mr. Kenneth M. Griffin, P.E.
Director of Engineering and Public Works
City of Coppell
255 Parkway Blvd.
Coppell, Texas 75019-4409
Re: Sandy Lake Road Reconstruction
Coppell Project #: ST 93-02
Kimley-Horn Project #: 06940600
DWU Project #: 98-311F
Dear Mr. Griffin:
It is our understanding that the sanitary sewer work at STA 15+77.13, 18.06 Lt. has been
modified to the following scope of work:
1. Remove the existing sanitary sewer manhole.
2. Reconnect the north to south 8" sanitary sewer line after removing the old manhole.
3. Plug the sanitary sewer line to the west of the old manhole.
4. Do not construct a new sanitary sewer manhole.
Our contract with the City addresses all of the required items of work, except for reconnecting
the sanitary sewer lines to the north and south of the old manhole. Our price for making this
connection is $580.00 plus the applicable footage of sanitary sewer pipe necessary to make the
connection.
If you havc any qucstion$ regarding this issue, don't hcsitatc to contact our office.
Sincerely, ~ Company
io: tion
Project Engineer
xc: Michael G. DeMotte, Kimley-Horn and Associates, Inc., 801 Cherry Street, Suite 1100
Fort Worth, Texas 76102-6803
AN EQUAL OPPORTUNITY EMPLOYER