Loading...
ST9302-CS 990207FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 February 7, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: As requested, our utility subcontractor, M-Co Construction, has submitted prices to install temporary water services to allow the 16" water line to be lowered at several locations without a disruption in service to several businesses. The following prices apply to the temporary water services detailed on the January 25, 1999 Kimley-Hom drawings near STA 8+85 and STA 62+30: 1. Temporary 8" water service at STA 8+85 $5,412.50 2. Temporary 6" waterline extension and service at STA 62+30 $12,178.00 3. Water service and tap at STA 62+30 $3,047.50 Please add an additional fourteen calendar days to the project's duration for the two temporary services. If you have m~y questions regarding this issue, don't hesitate to contact our office. Sincerely, ~, .~ . el Const~ctlon Company Robert D. Weber Project Engineer xc: Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER