ST9302-CS 990204 (2)FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 February 4, 1999 Mr. Kmmeth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Horn Project #: 06940600 DWUProject #: 98-311F Dear Mr. Griffin: In accordance with your guidance at the most recent monthly meeting, our utility subcontractor, M-Co Construction, has revised their prices for the two additional 16" gate valves to be installed to isolate portions of the existing 16" water line. As directed, these prices have been adjusted to include the cost to purchase and install the 16" valve. Our utility subcontractor, M-Co Construction, has submitted the following prices to cut those valves into the existing RCCP or DI water line: 1. Additional cost to cut-in 16" gate valve on RCCP line $12,800.00 2. Additional cost to cut-in 16" gate valve on ductile iron pipe $12,400.00 Please note that these prices do not include a vault or the bypass. Please add an additional eight calendar davs to the r~roiect's duration for the txvo additional valves. If you have any questions regarding this issue, don't hesitate to contact our office. Sirlcerely, E,~].~-ol. ]~tionrlf~lll~cmct~ Company i '~ d 0 ~ Robert D. Weber Project Engineer xc: Michael G. DeMotte, Kimley-Horn and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER