Loading...
ST9302-CS 990102 (5)FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 January 2, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: It is our understanding that the City of Coppell has requested that two additional 16" gate valves be installed to isolate portions of the existing 16" water line. Our utility subcontractor, M-Co Construction, has submitted the following prices to cut those valves into the existing RCCP or DI water line: 1. Additional cost to cut-in 16" gate valve on RCCP line $4,300.00 2. Additional cost to cut-in 16" gate valve on ductile iron pipe $3,900.00 Please note that these prices are for extra work only and that the gate valve and vault would still need to be paid utilizing pay item #94 - 16" M.J. Gate Valve and Vault. Please add an additional eight calendar days to the project's duration for the two additional valves. If you have any questions regarding this issue, don't hesitate to contact om office. ~i~cerely, ell Const tion Company Robert D. Weber Project Engineer xc: Michael G. DeMotte, Kimtey-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 ~/~1.., ' ~,~ AN EQUAL OPPORTUNITY EMPLOYER