Loading...
WA9302-LR 960116 (12)'qEOTECHNICAL E GEE Consultants, Inc. E NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REINFORCING STEEL PLACEMENT Report Date January 16, 1996 Test Date: January 3, 1996 Client City of Coppell General Report No.: 8 Project 6.0 MG Water Storage Tank Project No.: 95-196 Identification Field Inspection of Reinforcing Steel Method of Test Visual Inspection Results On January 3, 1996 a representative of GEE Consultants, Inc. was present at the above referenced project to perform reinforcing steel inspection: Wall panels WE-2, WA-2 Dome Panels 4C-2, 5C-2, 6D-2, 5D-2, 4D-2, 5E-2, 6E-2, 6F-2, 2B-3, 2A-3, 1A-3, 4A-3, 5A-3, 6A-3, 3A-3, 3B-3 The following discrepancies were noted and called to the attention of Bob, a representative of Natgun. Weld tabs out of position in several locations. The above discrepancies were corrected as noted. ~ cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea