Latter-day-LR 950208Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
~=roject
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number -'
D4-251B-01-29137
Supplier
IDate of Observation
JAN. 9r 1995
RoneEn, ineers
IPurchase Order
~po~ Date
;FEB. 8r 1995
To
JOHN HORTON ARCHITECT
Location
GRADE BEAM EAST & WEST ENTRY WAY ON SOUTH SIDE OF BUILDING
Con.actor ITicket
W. B. KIBLER CONSTRUCTION Ipia~t .~ruck
TXI I316612
Mix Number tMix Description
WeatherMILD Conditions . IAmbient Temperature74
~me Sampled I Water Added
1:35 PM I 15.0 GALS
Physical Data
· ACTUAL "
SLUMP (in.)' 4 3/4
Concrete Cylinder Test(s)
· ACTUAL
Specimen j Age
No. I (Cmys)
49 7
50 28
51 28
52 HOLD
i Tot ~ad I ~mpre~s~e Sl3'~3g~
~s.) ~
01/16/95 90000 3180
02/06/95 124500 4400
02/06/95 122500 4330
HOLD
Curing Method est ~ lama 28.27 sq. in.
A.~-'TM C 31 C 39
I
I:mmarks ~d/or Db~'bu'~n
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER COl
SAM CARDWELL (1), BILL FOW-KES/BILL FOWKES (1), CIT
LARRY DAVIS (r)
lCor~cn ,,re Temperature (',=)
SPi=C:IFICATIONS
SPI~CIFICATIONS
3000
~STRUCTION/
~ OF COPPELL/
/Rone Engineers
we nev~ no co(~t~ot. Out le~efl Incl rec3orf3 a~'l Col ~ ezcJu~ u~e of Ihe cflent~ t= v~ ~ey I~ I~