Latter-day-LR 950210Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number Date of Observation IR
D4-251B-01-29292-A FEB. 2, 1995
To
JOHN HORTON ARCHITECT
Loca~on
SLAB ON GRADE 2ND POUR - 27' WEST & 5' NORTH OF S.E
RoneEn
IPurchase Order
..port Date
FEB. 10, 1995
BLDG. CORNER
C, on~or
W. B. KIBLER CONSTRUCTION.
P__ 1 467
Supplier
TXI
Temperature (°F)
69
IMix Number IMix Description
45
WeaRer Conditions
CLEAR
Time Sampled I Water Added
1 :.00 PM
I
0.0 GALS
Physical Data
· ACTUAL SPEClFICATIONS
SLUMP (in..) 5 1/2
Concrete Cylinder Test(s)
Test Date
Tot Load
(rs.)
I
02/09/95
03/02/95
03/02/95
HOLD
Spe~men Age i
No. (Days)
I
77 7
78 28
79 28
80 HOLD
Curing Met.hod Feat Method Standard 6' x 12'
AS'TM C 31 IASTM C 39 Area 28.27 sq. in.
ClF1CATIONS
Compr_~___~ve Stmng~
82000 2900
SPE
Engineer/Technician
MIKE FULLER
I=~nan~ ~d/~ Dism~on
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CO
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT
LARRY DAVIS (t)
3000
~STRUCTION/
~ OF COPPELL/
ineers
Rone Engineers