Loading...
Latter-day-LR 950210 (2)Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project W. B. KIBLER CONSTRUCTION RoneEn CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS of Observa~on D4-251B-01-29317 IFEB. 7t 1995 To JOHN HORTON ARCHITECT SLAB - WEST SIDE OF POUR #3 10' E X 10' N OF SOUTHWEST CORNER I 330305 IPurchase Order Report Date FEB. 10, 1995 neers Supplier Mix Number IMix Description 45 I Weather Condit~ofls PARTLY CLOUDY Nme Sampled 7:20 AM jWater Added 0.0 G~LS ~te Temperature (°F) 62 !Physical Data · ACTUAL '- SP =ClFiOATIONS SLUMP (in.)- 4 1/4 Concrete Cylinder Test(s) · ACTUAL SPI CIRCA'I'IONS Specimen Age No. (Days) Tot Load t Compressive Stmngffi ~bs.) (mO 101000 3570 Test Date 69 7 02/14/95 70 28 03/07/95 71 28 03/07/95 72 HOLD HOLD Curing Metm:)d Feat Method IStandarcl 6' x 12" Engineer/Technician ASTM C 3~ IASTM C 3s IArea ze~7 sq. ~ KEVIN TUCKER and/or Distn'bution JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER COl SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT' LARRY DAVIS (1-) Required 3000 ~Rone Engineers we have ~ comTot. Ou~ lettem an,, re~ ar~ foe ~e exc~ue,v~ u~e et t~ ~ to ~ I~/~ aa4=ltlS~. [STRUCTION/ OF COPPELL/