Latter-day-LR 950210 (2)Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
W. B. KIBLER CONSTRUCTION
RoneEn
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
of
Observa~on
D4-251B-01-29317 IFEB. 7t 1995
To
JOHN HORTON ARCHITECT
SLAB - WEST SIDE OF POUR #3 10' E X 10' N OF SOUTHWEST CORNER
I 330305
IPurchase Order
Report Date
FEB. 10, 1995
neers
Supplier
Mix Number IMix Description
45
I
Weather Condit~ofls
PARTLY CLOUDY
Nme Sampled
7:20 AM
jWater Added 0.0 G~LS
~te Temperature (°F)
62
!Physical Data
· ACTUAL '- SP =ClFiOATIONS
SLUMP (in.)- 4 1/4
Concrete Cylinder Test(s)
· ACTUAL SPI CIRCA'I'IONS
Specimen Age
No. (Days)
Tot Load t Compressive Stmngffi
~bs.) (mO
101000 3570
Test Date
69 7 02/14/95
70 28 03/07/95
71 28 03/07/95
72 HOLD HOLD
Curing Metm:)d Feat Method IStandarcl 6' x 12" Engineer/Technician
ASTM C 3~ IASTM C 3s IArea ze~7 sq. ~ KEVIN TUCKER
and/or Distn'bution
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER COl
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT'
LARRY DAVIS (1-)
Required
3000
~Rone Engineers