Concrete Cylinder Test Report
IPumhase Order
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number .' Date of Observaf~3n
D4-251B-01-29317-A F~B. 7t 1995
JOHN HORTON ARCHITECT
Location
SLAB - WEST SIDE OF POUR ~3 30' S X 15' E OF NORTHW
W. B. KIBLRR CONSTRUCTION
Ptant ruck
SupplierTxi 131 ~362
Mix Number IM~x Description
45
I
· jAmbient Temperature ifF)
I
46
Weather Condilions
CLOUDY
Time Sampled t Water Added
9:40 AM I 0.0 GALS
Physical Data
· ACTUAL
SLUMP (in.). 4 1/2
Concrete Cylinder Test(s)
" ACTUAL
s~.'"t
(Days)
73 7
74 28
75 28
76 HOLD
Test Date
j Tot
Load J Compressive Stmng~
89000 3150
02/14/95
03/07/95
03/07/95
HOLD
~ C s~ Ias'rM c as lama 2e~7 sq. in. I KEVIN TUCKER
Remains and/or Omm%u~on
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CO'.
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT
LARRY DAVIS (1-)
a. eport Date
FEB. 10, 1995
EST CORNER
T~cket
330477
ICor~ca-, ~ Temperature ('~
SF' --CIFICATION$
SPI-'CIFICATIONS
S~ngth Required
3000
ISTRUCTION/
~ OF COPPELL/
/~Rone Engineers