Latter-day-LR 950210 (4)Rone Engineers
Geotechnica[ Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Numb~ -' tDate of O~e~on
D4-251B-01-29292 I FEB. 2, 1995
JOHN HORTON ARCHITECT
Loca~on
SLAB ON GRADE - 2ND POUR 50'N & 22'E OF BUILDING C(
~nl~4~or
W. B. KIBLER CONSTRUCTION.
RoneEn lineers
IPurchase Order
~eport Date
FEB. 10~ 1995
)RNER
T~cket
327808
SupplierTXi P% 1 t 385
Mix Number IMix Descdp~on
45
Weather Conditions CLEAR
Time Sampled
11.: 30 AM
Physical Data
Water Added 0.0 GALS
SLUMP (in.-)
Concrete Cylinder Test(s)
(D~ Test Date
1
65 7 02/09/95
66 28 03/02/95
67 28 03/02/95
68 HOLD HOLD
Tot Load
88000
· ACTUAL "
5 1/4
SP!
Compressive ~t~ncjth
SPE
3110
te Temperature (,~')
66
-:ClFICATIONS
!ClFtCATIONS
;t~ncjltl Required
IEngineer/'l'echnician
MIKE FULLER
3000
we have r~o c~nlzoL Out lettem anti rel:x~ .&re for t~e exc~umv~ u~ a~ ~ c~en~ ~ ~ ~ey line aam~aea.
Rone Engineers
Curing Method Fest Me~d Standm'cl 6' x 12'
ASTN! C 31 IASTM C 39 .~,ea 28.27 sq. in.
Remarks and/or Distn'oulion
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CC
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CI~
LARRY DAVIS (:L)
iNSTRUCTION/
'Y OF COPPELL/