Latter-day-LR 950208 (3)Rone Engineers
Geotechnical Consultants
Materials Testing
RoneEn, ,ineers
Concrete Cylinder Test Report
Purchase Order
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
I ~teofObs~,cva~on
JAN. 27, 1995
/
OF NORTHEAST CORNER OF S~
Date
D4-251B-01-29247-A
JOHN HORTONARC~ITECT
GYM SLAB, 25' W. X 15' S.
W. B. KIBLER CONSTRUCTION~
TXI
Mix Number jMix Description
45
CLEAR
IWaterAdcled 15.0 GALS
324878
· Temperature (%=)
?0
1:04 PM
Physical Data
· ACTUAL '- SPECIFICATIONS
SLUMP (in.') 4 3/4
Concrete Cylinder Test(s)
" ACTUAL SPE ClFICAT1ONS
Age I Tot Load Compremive St~'eng~ $ I~ngl~ Required
No. (Days) Test Date (lbs.) {~s~ (l:~')
3000
I
61 7 02/03/95
62 28 02/24/95
63 28 02/24/95
64 HOLD HOLD
104000 3680
~STRUCTION/
~ OF COPPELL/
~Rone Engineers
UMITA'rlON~: T~® te~:rem.,r~ he~m,,,~.e l~e~ll baaed ~t~e~a:MeWaem~le~fm'le~lm;. Weas~umenem~e~ bllltyfm'
IAsTMc~s I KEVIN TUCKER
JOHN R. HORTON/JOHN R. HORTON (1), W. B. KIBLER CO:
SAM CARDWELL (1), BILL FOWKES/BILL FOWKES (1), CIT
LARRY DAVIS (~)