WA9302-LR 960112FROM: RICHARD GEE
TO: LARRY DAVIS
RECEIVED 1-12-96
GEE Consultants, Inc.
J E JNVIRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas ~5229 · (214) 620-979'1 · F;~x i214) 620-9794
FAX TRANSMITTAL SHEET
GEO.TECHNICAL ENGINEERING DESIGN CONSIDERATIONS
· F'ioor gabs plaid at gra~ should be provided with a rnoistur~ barrier in order to prevent wet spots.
· Roof drainage should be collected by a system of gutters and dowmp~uts and transmitted away from the structur~ where the water c.~
drain away without entering the soil,
· PoStire landscaping ~hould include provisions such that the perimeter surface area slopes away from s|ructures where the water c~ drain
away without entering the soil.
0' An adequate drab~ti¢ sy~em, above and bciow grades, should be provided around structures In areas where positive drainage away from
the building eramot be maintained.
· Any water accumulation from plumbing leaks, water line leas, ,prinkler system, etC. which occur under or near foundation lystems will
cause significar~ distrcss.
CONFIDENTIALITY NOTICn: This facsimile contains confidential information whie~ may also be legally privileged and whi~ is
intended for die use of the Addressee(s) named above. If you arc not the intended recipient, or the employee or agent responsible for
delivering it to the intended recipient, you are hereby notified that any disse,nination or copying of this facsimile, or the taking of any action in
reliance on the centcam of this talecopied information, may be stricdy prohibited. If you have received this facsimile in error, please notify ul
immediately by 21ephone and return the entire facsimile to us at the above address via U.S. Postal Service,
' J~ EOTECHNICAL
GEE Consultants, Inc.
L
_~NVIRONMENTAL
2540 Glenda Lane * Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9~94
January 10, 1996
Mr. Bob Barbarisi
Natgun Corporation
Eleven Teal Road
Wakefield, MA 01881-1292
RE: 6.0 MG Groundwater Storage Tank
Coppell, Texas
Dear Mr. Barbarisi:
We are trying to resolve the problem we have had receiving payment on invoices related to the
above referenced project. The invoices in question are 5258-1, 5258-2, 5258-3 and 52584. The
oldest invoice dates back to September of 1995. Enclosed are copies for your reference
I have personally discussed this issue on the telephone with you on three occasions. Mr. Kenneth
McCannon, an employee of GEE Consultants, has also left messages with you on three occasions
to which he received no reply.
We need to have this issue resolved by January 12, 1996, Please call us as soon as possible.
Thank you for your prompt attention in this matter.
Sincerely,
chard W. ae~, P.E.
President
RWG/Ieg
GEE Consultants, Inc.
2540 Glenda Lane * Suite 108
Dallas, Texas 75229
To: Mr. Bob Barbarisi, Jr. Invoice No,: 5258-1
Natgun Corporation Invoice Date: September 25, 1995
Eleven Teal Road
Wakefield, MA 01880-1292
Project: Field and Laboratory Testing Performed
September, 1995
(5.0 MG Ground Water Storage Tank
Coppell, Texas
Terms; Due Upon Receipt
~-,, i -. _ - . ....... I
Dat~ of Description Quantity Rate Total
Sampling
0848-95 Pier Inspection, Over time rate
1.5 hrs $40.16 $60.24
(before 7:30 am, after 5:00 pm)
08-:29-95 Pier Inspection Cancell ation 2.75 hrs $29.75 $8 I. 81
08-30-95 Pier Inspection, over time
0.5 hrs $40.16 $20.08
(before 7;30 am, after 5:00 pro)
08-31-95 Pier Inspection, over time
1.0 hrs $40.16 $40.16
(before 7;30 am, after 5:00 pro)
09-05-95 Pier Inspection, over time
0.75 hrs $40.16 $30.12
(before 7;30 am, after 5:00 pro)
09-06-95 Pier Inspection, over time
035 lxrs $40.16 $30.12
(before 7:30 am, after 5:00 pro)
09-07-95 Pier Inspection, over time 0.5 hrs
$40.16 $20.08
Coofore 7:30 am, after 5:00 pro)
09-11-95 Pier Inspection, Over time (before 7:30 1.0 llrs $40.16 $40.16
am, after 5:00 pm)
09-14-95 Pier Inspection, Over time (before 7:30 0.25 hrs $40.16 $10.04
am, after 5:00 pro)
09-15-95 Pier Inspection, Over time (before 7:30 0.75 hrs $40.16 $30.12
era, afttr 5:00 pro)
09-18-95 Pier Inspection, Over time (before 7:30 0.5 hrs $40.16 $20.08
am, after 5:00 pro)
09-19-95 Pier Inspection Cancellation, Regular time 4.0 hrs $29.75 $119.00
GEE Consultants, Inc.
2540 Glenth Lan~ · Suite 108
Dallas, T~as 75229
City of Coppell
6.0 MG Water Storage Tank
September 25, 1995
Page 2 of 2
In?olce S258-1
Date of
Sampling Description Qunntity Rate Total
09~19-95 Pier Inspection Cancellation, Over time 0.5 hrs $40.16 $20.08
(before 7:30 am, after 5:00
09-20-95 Pier Inspection Cancellation, Regular 2.75 hrs $29.75 $81.81
09-20-95 Pier Inspection Cancellation, Over time 0.25 hrs $40.16 $10.04
(before 7:30 am, after 5:00 pro)
09-21-95 Pier Inspection, Over time (before 7:30 0.5 hrs $40.16 $20.08
am, after 5:00
09-22-95 Pier Inspection, Over time (before 7:30 1.5 hrs $40. I6 $60.24
am, after 5:00
09-25-95 Pier Inspection, Over time (before 7;30 1.0 bxs $40.16 $40.16
am, after 5:00 pro)
Please Pay $734,42
GEE Consultants, Inc.
2540 Glenda Lane · Suite 108
Dallas, Texas 75229
To: Mr. Bob Barbarisi, Jr. Invoice No.: 5258-2
Natgun Corporation Invoice Date: October 26, 1995
Eleven Teal Road
Wakefield, MA 01880-1292
Project: Field and Laboratory Testing Performed
OcWber, 1995
6.0 MG Oround Water Storage Tank
Coppell, Texas
Terms: Due Upon Receipt
Date of
Sampling Description Quantity Rate Total
09-26-95 Pier Inspeotion, Over time rate (before 7:30 0.5 hrs $40116 $20.08
am, after 5:00 pro)
09-27-95 Pier Inspection, Over time raw (before 7:30 0.75 hrs $40.16 $30.12
am, after 5:00 pro)
09-28-95 Pier Inspection, Over time rate (before 7:30 1.75 hrs $40.16 $70.28
am, after 5:00 pro)
09-29-95 Pier Inspection, Over time rate (before 7:30 1.0 hrs $40.16 $40.16
am, after 5:00 pro)
10-02-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08
am, after 5:00 pro)
10-03-95 Pier hspeotion, Over time rate (before 7:30 1,25 hre $40.I6 $:f0.20
am, after 5:00 pro)
10-04-95 Pier Inspection, Over time rate (before 7:30 0.5 his $40.16 $20.08
am, after 5:00 pro)
I0-05-95 Pier Inspection, Over time rate (before 7:30 1.2S hrs $40.16 $50.20
am, after 5:00 pro)
10-06-95 Pier Inspection, Over time rate (before 7:30 0,5 hrs $40.16 $20.08
am, after 5:00 pro)
10-09-95 Pier Inspection, Over time rate (before 7:30 0.:5 his $40.16 $20.08
am, after 5:00 pro)
10-10-95 Pier Inspection, Over time rats (before 7:30 1.0 hrs $40. I6 $40.16
am, after 5:00 pro)
10-11-95 Pier Inspection, Over time rate (before 7:30 1.5 hrs $40.16 $60.24
am. after 5:00 pro)
GEE Consultants, Inc.
2540 Olenda Lane, Suite 108
Dallas, Texas 75229
City of Coppetl
6,0 MG Water Storage Tank
October 25, 1995
Page 2 of 2
Invoice 5258-2
Date of
Sampling Description Quantity Rate Total
10-12-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08
am, after 5:00 pro)
10-13-9:5 Pier Inspectlea, Over time rate (before 7:30 1.0 hrs $40.16 $40.16
am, after 5:00 pro)
10-16-95 Pier Insp~tion, Over time rate (before 7:30 0.5 hrs $40.16 $20.08
am, after 5:00 pro)
10-17-95 Pier Inspe~etion, Over time rate (befor~ 7:30 0.5 hrs $40.16
am, after 5:00 pro)
10-18-9:5 Pier Inspection, Over time rate (before 7:30 1.0 hrs $40.16 $40.16
am, after 5:00 pro)
10-19-9:5 Pier laape. ctioa, Over time rate (l~fore 7:30 0.5 hrs $40.16 $20.08
am, after 5:00 pro)
10-20-9:5 Pier Inspection, Over time rate (before 7:30 0.25 hrs $40.16 $10,04
am, after 5:00 pro)
10-23-95 Pier Inspection, Over ttmc rat~ (bct~re 7:30 1.0 hrs $40.16 $40.16
am, after 5:00 pro)
10-24-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08
am, af'~ 5:00 pro)
10-25-95 Pier Insp~tion, Over time rate (before 7:30 0.5 hrs $40.16 $20,08
am, after 5:00 pro)
10-26-95 Pier Inspectlea, Over time rat~ (befor~ 7:30 0.5 hrs $40.16 $20.08
am, after 5:00 pro)
Pltase Pay $712.84
_. ~~:~O 96 '~T
GEE Consultants, Inc.
2540 Glenda Lane, Suite 108
Dallas, Texas 75229
To: Mr. Bob Barbarlsi, Jr. Invoice No.: 5258-3
Natgun Corporation Invoice Date: November 27, 1995
Eleven Teal Road
Wakefield, MA 01880-1292
Project: Field and Laboratory Testing Performed
November, 1995
(5.0 MG Ground Water Storage Tank
Coppell, Texas
Terms: Due Upon Receipt
Date of
Sampling Description Quantity Rate Total
10-30-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08
am, after 5:00 pm)
10-31-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08
am, after 5:00 pro)
11-01-95 Pier Itts~ection cancellation, Over time rate 0.5 hrs $40.16 $20.08
Coefore 7:30 am, after 5:00 pro)
11-01-95 Pier Inspection cancellation, Regular time 2.25 hrs $29.75 $66.94
11-01-95 Trip Charge I eka $12.50 $i2.50
11-02-95 Pier Inspection, Over time rate Coefore 7:30 0.5 hrs $40.16 $20.08
am, after 5:00 pro)
i1-03-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40,16 $20.08
am, after 5:00 pm)
11-06-94J Pier Inspection, Over time rate (before 7:30 0.5 hrs $40,16 $20.08
am, after 5:00 pro)
11-07-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08
am, after 5:00 pro)
11-08-95 Pier h~spection, Over time rate (before 7:30 1.0 hrs $40.16 $40. I6
am, after 5:00 pro)
11-09-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08
am, after 5:00 pro)
GEE Consultants, Inc.
2540 Gl~nda Lane · 3uite 108
Dallas, Texas 75229
City of Coppsll
6.0 M~3 Water Storage Ta~k
(~S~r 25, 1995
Dale of
Sampling D~eriptlon Quantity hte To~I
11-10-95 Pier Insetion, Over time ~te (~fore 7:30 0.5 hrs $~.16 $20.08
am, a~ 5:~
Please Pay $300.32
· ' GEE Consultants, Inc.
2540 61enda Lane , Suite//108 · Dallas, Texas 75229 · (214) 620-9791· Fax (214) 620-9794
i lNVOICEi
To: Mr. l}ob Barbarisl, Jr. Invoice No,: 52584
Natgun Corporation Invoice Date: December 26, 1995
Eleven Teal Road
Wal~e~eld, MA 01880-1292
Project: Field and Laboratory Testing Performed
December, 1995
6.0 MG Ground Water Storage Tank
Coppell, Texas
Tenn.: Duo Upon R~ceipt
Date or
Sampling Description Quantity Rate Total
12-09o95 Concrete Mix Inspection, Over time rate 9.$ hrs $10.41 $98.90
(Saturday)
I2-09-95 Concrete Mix Inspection, Over time rate 6.0 hrs $40.16 $240.96
(before 7:30 am, after 5:00 pro)
Please PRY $339.86