Loading...
WA9302-LR 960112FROM: RICHARD GEE TO: LARRY DAVIS RECEIVED 1-12-96 GEE Consultants, Inc. J E JNVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas ~5229 · (214) 620-979'1 · F;~x i214) 620-9794 FAX TRANSMITTAL SHEET GEO.TECHNICAL ENGINEERING DESIGN CONSIDERATIONS · F'ioor gabs plaid at gra~ should be provided with a rnoistur~ barrier in order to prevent wet spots. · Roof drainage should be collected by a system of gutters and dowmp~uts and transmitted away from the structur~ where the water c.~ drain away without entering the soil, · PoStire landscaping ~hould include provisions such that the perimeter surface area slopes away from s|ructures where the water c~ drain away without entering the soil. 0' An adequate drab~ti¢ sy~em, above and bciow grades, should be provided around structures In areas where positive drainage away from the building eramot be maintained. · Any water accumulation from plumbing leaks, water line leas, ,prinkler system, etC. which occur under or near foundation lystems will cause significar~ distrcss. CONFIDENTIALITY NOTICn: This facsimile contains confidential information whie~ may also be legally privileged and whi~ is intended for die use of the Addressee(s) named above. If you arc not the intended recipient, or the employee or agent responsible for delivering it to the intended recipient, you are hereby notified that any disse,nination or copying of this facsimile, or the taking of any action in reliance on the centcam of this talecopied information, may be stricdy prohibited. If you have received this facsimile in error, please notify ul immediately by 21ephone and return the entire facsimile to us at the above address via U.S. Postal Service, ' J~ EOTECHNICAL GEE Consultants, Inc. L _~NVIRONMENTAL 2540 Glenda Lane * Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9~94 January 10, 1996 Mr. Bob Barbarisi Natgun Corporation Eleven Teal Road Wakefield, MA 01881-1292 RE: 6.0 MG Groundwater Storage Tank Coppell, Texas Dear Mr. Barbarisi: We are trying to resolve the problem we have had receiving payment on invoices related to the above referenced project. The invoices in question are 5258-1, 5258-2, 5258-3 and 52584. The oldest invoice dates back to September of 1995. Enclosed are copies for your reference I have personally discussed this issue on the telephone with you on three occasions. Mr. Kenneth McCannon, an employee of GEE Consultants, has also left messages with you on three occasions to which he received no reply. We need to have this issue resolved by January 12, 1996, Please call us as soon as possible. Thank you for your prompt attention in this matter. Sincerely, chard W. ae~, P.E. President RWG/Ieg GEE Consultants, Inc. 2540 Glenda Lane * Suite 108 Dallas, Texas 75229 To: Mr. Bob Barbarisi, Jr. Invoice No,: 5258-1 Natgun Corporation Invoice Date: September 25, 1995 Eleven Teal Road Wakefield, MA 01880-1292 Project: Field and Laboratory Testing Performed September, 1995 (5.0 MG Ground Water Storage Tank Coppell, Texas Terms; Due Upon Receipt ~-,, i -. _ - . ....... I Dat~ of Description Quantity Rate Total Sampling 0848-95 Pier Inspection, Over time rate 1.5 hrs $40.16 $60.24 (before 7:30 am, after 5:00 pm) 08-:29-95 Pier Inspection Cancell ation 2.75 hrs $29.75 $8 I. 81 08-30-95 Pier Inspection, over time 0.5 hrs $40.16 $20.08 (before 7;30 am, after 5:00 pro) 08-31-95 Pier Inspection, over time 1.0 hrs $40.16 $40.16 (before 7;30 am, after 5:00 pro) 09-05-95 Pier Inspection, over time 0.75 hrs $40.16 $30.12 (before 7;30 am, after 5:00 pro) 09-06-95 Pier Inspection, over time 035 lxrs $40.16 $30.12 (before 7:30 am, after 5:00 pro) 09-07-95 Pier Inspection, over time 0.5 hrs $40.16 $20.08 Coofore 7:30 am, after 5:00 pro) 09-11-95 Pier Inspection, Over time (before 7:30 1.0 llrs $40.16 $40.16 am, after 5:00 pm) 09-14-95 Pier Inspection, Over time (before 7:30 0.25 hrs $40.16 $10.04 am, after 5:00 pro) 09-15-95 Pier Inspection, Over time (before 7:30 0.75 hrs $40.16 $30.12 era, afttr 5:00 pro) 09-18-95 Pier Inspection, Over time (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 09-19-95 Pier Inspection Cancellation, Regular time 4.0 hrs $29.75 $119.00 GEE Consultants, Inc. 2540 Glenth Lan~ · Suite 108 Dallas, T~as 75229 City of Coppell 6.0 MG Water Storage Tank September 25, 1995 Page 2 of 2 In?olce S258-1 Date of Sampling Description Qunntity Rate Total 09~19-95 Pier Inspection Cancellation, Over time 0.5 hrs $40.16 $20.08 (before 7:30 am, after 5:00 09-20-95 Pier Inspection Cancellation, Regular 2.75 hrs $29.75 $81.81 09-20-95 Pier Inspection Cancellation, Over time 0.25 hrs $40.16 $10.04 (before 7:30 am, after 5:00 pro) 09-21-95 Pier Inspection, Over time (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 09-22-95 Pier Inspection, Over time (before 7:30 1.5 hrs $40. I6 $60.24 am, after 5:00 09-25-95 Pier Inspection, Over time (before 7;30 1.0 bxs $40.16 $40.16 am, after 5:00 pro) Please Pay $734,42 GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 Dallas, Texas 75229 To: Mr. Bob Barbarisi, Jr. Invoice No.: 5258-2 Natgun Corporation Invoice Date: October 26, 1995 Eleven Teal Road Wakefield, MA 01880-1292 Project: Field and Laboratory Testing Performed OcWber, 1995 6.0 MG Oround Water Storage Tank Coppell, Texas Terms: Due Upon Receipt Date of Sampling Description Quantity Rate Total 09-26-95 Pier Inspeotion, Over time rate (before 7:30 0.5 hrs $40116 $20.08 am, after 5:00 pro) 09-27-95 Pier Inspection, Over time raw (before 7:30 0.75 hrs $40.16 $30.12 am, after 5:00 pro) 09-28-95 Pier Inspection, Over time rate (before 7:30 1.75 hrs $40.16 $70.28 am, after 5:00 pro) 09-29-95 Pier Inspection, Over time rate (before 7:30 1.0 hrs $40.16 $40.16 am, after 5:00 pro) 10-02-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 10-03-95 Pier hspeotion, Over time rate (before 7:30 1,25 hre $40.I6 $:f0.20 am, after 5:00 pro) 10-04-95 Pier Inspection, Over time rate (before 7:30 0.5 his $40.16 $20.08 am, after 5:00 pro) I0-05-95 Pier Inspection, Over time rate (before 7:30 1.2S hrs $40.16 $50.20 am, after 5:00 pro) 10-06-95 Pier Inspection, Over time rate (before 7:30 0,5 hrs $40.16 $20.08 am, after 5:00 pro) 10-09-95 Pier Inspection, Over time rate (before 7:30 0.:5 his $40.16 $20.08 am, after 5:00 pro) 10-10-95 Pier Inspection, Over time rats (before 7:30 1.0 hrs $40. I6 $40.16 am, after 5:00 pro) 10-11-95 Pier Inspection, Over time rate (before 7:30 1.5 hrs $40.16 $60.24 am. after 5:00 pro) GEE Consultants, Inc. 2540 Olenda Lane, Suite 108 Dallas, Texas 75229 City of Coppetl 6,0 MG Water Storage Tank October 25, 1995 Page 2 of 2 Invoice 5258-2 Date of Sampling Description Quantity Rate Total 10-12-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 10-13-9:5 Pier Inspectlea, Over time rate (before 7:30 1.0 hrs $40.16 $40.16 am, after 5:00 pro) 10-16-95 Pier Insp~tion, Over time rate (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 10-17-95 Pier Inspe~etion, Over time rate (befor~ 7:30 0.5 hrs $40.16 am, after 5:00 pro) 10-18-9:5 Pier Inspection, Over time rate (before 7:30 1.0 hrs $40.16 $40.16 am, after 5:00 pro) 10-19-9:5 Pier laape. ctioa, Over time rate (l~fore 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 10-20-9:5 Pier Inspection, Over time rate (before 7:30 0.25 hrs $40.16 $10,04 am, after 5:00 pro) 10-23-95 Pier Inspection, Over ttmc rat~ (bct~re 7:30 1.0 hrs $40.16 $40.16 am, after 5:00 pro) 10-24-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08 am, af'~ 5:00 pro) 10-25-95 Pier Insp~tion, Over time rate (before 7:30 0.5 hrs $40.16 $20,08 am, after 5:00 pro) 10-26-95 Pier Inspectlea, Over time rat~ (befor~ 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) Pltase Pay $712.84 _. ~~:~O 96 '~T GEE Consultants, Inc. 2540 Glenda Lane, Suite 108 Dallas, Texas 75229 To: Mr. Bob Barbarlsi, Jr. Invoice No.: 5258-3 Natgun Corporation Invoice Date: November 27, 1995 Eleven Teal Road Wakefield, MA 01880-1292 Project: Field and Laboratory Testing Performed November, 1995 (5.0 MG Ground Water Storage Tank Coppell, Texas Terms: Due Upon Receipt Date of Sampling Description Quantity Rate Total 10-30-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pm) 10-31-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 11-01-95 Pier Itts~ection cancellation, Over time rate 0.5 hrs $40.16 $20.08 Coefore 7:30 am, after 5:00 pro) 11-01-95 Pier Inspection cancellation, Regular time 2.25 hrs $29.75 $66.94 11-01-95 Trip Charge I eka $12.50 $i2.50 11-02-95 Pier Inspection, Over time rate Coefore 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) i1-03-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40,16 $20.08 am, after 5:00 pm) 11-06-94J Pier Inspection, Over time rate (before 7:30 0.5 hrs $40,16 $20.08 am, after 5:00 pro) 11-07-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) 11-08-95 Pier h~spection, Over time rate (before 7:30 1.0 hrs $40.16 $40. I6 am, after 5:00 pro) 11-09-95 Pier Inspection, Over time rate (before 7:30 0.5 hrs $40.16 $20.08 am, after 5:00 pro) GEE Consultants, Inc. 2540 Gl~nda Lane · 3uite 108 Dallas, Texas 75229 City of Coppsll 6.0 M~3 Water Storage Ta~k (~S~r 25, 1995 Dale of Sampling D~eriptlon Quantity hte To~I 11-10-95 Pier Insetion, Over time ~te (~fore 7:30 0.5 hrs $~.16 $20.08 am, a~ 5:~ Please Pay $300.32 · ' GEE Consultants, Inc. 2540 61enda Lane , Suite//108 · Dallas, Texas 75229 · (214) 620-9791· Fax (214) 620-9794 i lNVOICEi To: Mr. l}ob Barbarisl, Jr. Invoice No,: 52584 Natgun Corporation Invoice Date: December 26, 1995 Eleven Teal Road Wal~e~eld, MA 01880-1292 Project: Field and Laboratory Testing Performed December, 1995 6.0 MG Ground Water Storage Tank Coppell, Texas Tenn.: Duo Upon R~ceipt Date or Sampling Description Quantity Rate Total 12-09o95 Concrete Mix Inspection, Over time rate 9.$ hrs $10.41 $98.90 (Saturday) I2-09-95 Concrete Mix Inspection, Over time rate 6.0 hrs $40.16 $240.96 (before 7:30 am, after 5:00 pro) Please PRY $339.86