Loading...
Lam Lee Add-LR000223 (3) ENGINEERING & TESTING, INC. February 23, 2000 Alice Lee c/o Reality Capital Corporation 1111 S. Main, Ste 200 Grapevine, Texas 76051 Project: Lam Lee Project: 00-014 Report No.: 00-014.145 Date Cylinder Made: 02-21-00 Date Cylinder Pickup: 02-22-00 Daily Activity Report A Soiltech Engineering and Testing, Inc. representative was present at the above referenced project. The technician was picking up and returning test cylinder to the laboratory for curing and testing. SOIL.TECH ENGINEERIN~ AND TESTING, INC. xJ,i~fnes M. Perdue Materials Testing Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595.0064 telephone · 817.589.7279 metro · 817.595.0708 fax