Loading...
Lam Lee Add-LR000223 (4)CONCRETE II~,.,PECTION AND COMPRESSIOk YEST REPORT CLIENT: Alice Lee C/O Reality Capital REPORT DATE: 02-23-00 PROJECT: Lam Lee REPORT NO.: 00-014,144 we: 1292 Technician: D. Rogers SPECr~cATiONS P~ECT DATA. Strength (psi): 3000 (~ 28 days Date of Placement: 02-16-00 Slump (in.): 5" Sampled By: D. Rogers Air Content (%): Weather: Clear and Mild Concrete Temp (°F): Supplier/Mix: Pioneer ~9327 Ticket #: 473605 Time Batched: 8:51 AM Time Sampled: 9:10 AM Slump (in.): 6" Air Content (%): N/A Unit Weight (pcf): N/A Concrete Temp (°F): 60° Air Temp (°F): 60° i Yardage (cu.yd.): 10 Location/Remarks: Piers F/3 and Gl3 SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTES NO. NO. TESTED (days) (lbs) (psi) 1 - 1 02-23 7 61000 2160 1 1-2 03-15 28 Set 1-3 3-15 28 1-4 Hold Hold FIELD DATA~ Ticket #: 473642 Time Batched: 1:05 PM Time Sampled: 1:45 PM Slump (in.): 6" Air Content (%): N/A Unit Weight (pcf): N/A Concrete Temp (°F): 60° Air Temp (°F): 59° Yardage (cu.yd.): 100 Location/Remarks: Piers Gl2 SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTES NO. NO. TESTED /daysl (lbsI IpsiI 2-1 02-23 7 66000 2330 2 2-2 03-15 28 Set 2-3 03-15 28 2-4 Hold Hold IOMINAL CY .INDER SIZE: 6 X 12. ~ ~REA: 28.27 sa. in. UNI .ESS NOTED 1ERE: TYPE "A" CONE ~-RACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY WITH PROJECT UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM C39 Soilte(;:h Engineering And '~sting, Inc. ~es M. Perd~e Materials Testing Manager 2502 Gravel DriVe · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817,589.7279 metro · 817.595.0708 fax