MacPlaza 1 Sun-CS 960604Mike Martin/ E. I. T.
Ted Dutt, Interim Utilities Superintendent ,.~
fees should be assessed and colIecte¢ on the abo
The following
referenced project.
Total
I ESU's
~ ESU ' s
$450.00 ea -~~_~_~e
Domestic Meter/s
Irrigation Meter/s
Fireline Meter/s -
ESU's ~
100% due prior to Council approval of the final plat.
- J Domestic Meter/s = , ESU',
Total / ESU's ~ $450.00 ea - '
100% due prior to Council approval of the final plat.
~ co,~ection~ ~ $~o.oo each - ,~ ~00'90
100% due prior to issuance of building permit for residential.
the case of multi-family, commercial, retail, industrial, fae
Water Tap Ins_l~ct/on Fee
(Resid
prior to issuance of meter).
Sewer Tap Inspection Pee
! co,~ections ~ Sso.oo each = $ 50°~
100% due ~tor to tssu~ce of building ~t.
(RE-INEP~CTXO~S for Water or Wa~te~ater $30.00)
(or in
is d~e
~ntial only)
II
Uttltt~ Final IMpection Fee (AIl DeVelo~m~t)
lots
100% due pr/or to issuance of building permit.
water me~~ee (Do~eeti=)
100% due prior to issuance of building permit for re~
Ail other development fees are due prior to issuance
Water ~mter Fee
(Irr i gat ion / Pire line )
Irrigation Meter/s ~ ~
Total
100% due prior to issuance of water meter/s.
Water WeterDepomit (Multi-Family or Hon-Remidential)
100% due prior to issuance of water meters.
Irrigation HeterDepomit
~ .eters , $35.00 ea = _~_~_~0
100% due pr/or to issuance of water meters.
ridential only.
)f meter/m.
Per. those dmvelopmentm having preliminaryplat a~prova~ prior to June
23.~e foisting use~s=*nt i~ a, te~~.
~ .~ti,1 ~ot, ,t $1so.oo ,,ch -
50% of the amount spec~_above shall be paid by ]the Developer;
mrior to Council approval of .t'*/sa/~.~t.
Sot z'M~J~hall hep aid bye he Bul.l*~at such Clap as a bulldtng
Developlent Fees
For those developments having prelimtnar~ plat approva
1992 the following assessment is determined:
Residential Lots at $350.00 each - $
Units (Multi-Family) at $350.00 each - $
50% of the amount s~ecified above shall be paid by the
to Council approval of final plat.
50% remaining shall be paid by the Builder at such ti~
permit is issued.
For those developments having preliminary plat approw
26, 1993 the following assessment is determined:
Residential Lots at $1,285.00 each - $
Units (Hulti-Family) at $1,285.00 each f $
100% of the amount specified above shall be paid b
prior to Council approval of final plat.
Please advise the Developer of these fees and due da'
If you have any questions regarding these assessment~
Shall be assessed and paid prior to final acceptance
Note:
This fee caImot be assessed~til after TU2
the lighting plan for the proposed project
submitted $292.60 per light will be assesse
See attached Street Sign A~sessment sheet.
I00% due pr/or to final acceptance of project.
Z after J~ne 23,
Developer prior
~ as a building
after October
the Developer
please advise.
project.
,lectric submits
Once plan is
Develop~t ~
p~ge4
STB~T SIGN ASSESSMENT
for
The following assessment is being ude in accordance
Coppeli SUbdivision Ordinance ~ppeadix A Chapter
following cost of those sign ~aterials requ/red are b
pricing which is reviewed on a regular basis.
No Parking
Speed Limit
Yield
Stop
Street Name
Stop & Street Combo
OTHER
Cost breakdowns may be obtained from Public Wc
request.
DEVF~ES.HLP
~isk~3 for~
iCh Che ¢it~ of
VIII A. The
ased on current
ENDED PRICE
,rks by written
Revised 1/2219~