Loading...
MacPlaza 1 Sun-CS 960604Mike Martin/ E. I. T. Ted Dutt, Interim Utilities Superintendent ,.~ fees should be assessed and colIecte¢ on the abo The following referenced project. Total I ESU's ~ ESU ' s $450.00 ea -~~_~_~e Domestic Meter/s Irrigation Meter/s Fireline Meter/s - ESU's ~ 100% due prior to Council approval of the final plat. - J Domestic Meter/s = , ESU', Total / ESU's ~ $450.00 ea - ' 100% due prior to Council approval of the final plat. ~ co,~ection~ ~ $~o.oo each - ,~ ~00'90 100% due prior to issuance of building permit for residential. the case of multi-family, commercial, retail, industrial, fae Water Tap Ins_l~ct/on Fee (Resid prior to issuance of meter). Sewer Tap Inspection Pee ! co,~ections ~ Sso.oo each = $ 50°~ 100% due ~tor to tssu~ce of building ~t. (RE-INEP~CTXO~S for Water or Wa~te~ater $30.00) (or in is d~e ~ntial only) II Uttltt~ Final IMpection Fee (AIl DeVelo~m~t) lots 100% due pr/or to issuance of building permit. water me~~ee (Do~eeti=) 100% due prior to issuance of building permit for re~ Ail other development fees are due prior to issuance Water ~mter Fee (Irr i gat ion / Pire line ) Irrigation Meter/s ~ ~ Total 100% due prior to issuance of water meter/s. Water WeterDepomit (Multi-Family or Hon-Remidential) 100% due prior to issuance of water meters. Irrigation HeterDepomit ~ .eters , $35.00 ea = _~_~_~0 100% due pr/or to issuance of water meters. ridential only. )f meter/m. Per. those dmvelopmentm having preliminaryplat a~prova~ prior to June 23.~e foisting use~s=*nt i~ a, te~~. ~ .~ti,1 ~ot, ,t $1so.oo ,,ch - 50% of the amount spec~_above shall be paid by ]the Developer; mrior to Council approval of .t'*/sa/~.~t. Sot z'M~J~hall hep aid bye he Bul.l*~at such Clap as a bulldtng Developlent Fees For those developments having prelimtnar~ plat approva 1992 the following assessment is determined: Residential Lots at $350.00 each - $ Units (Multi-Family) at $350.00 each - $ 50% of the amount s~ecified above shall be paid by the to Council approval of final plat. 50% remaining shall be paid by the Builder at such ti~ permit is issued. For those developments having preliminary plat approw 26, 1993 the following assessment is determined: Residential Lots at $1,285.00 each - $ Units (Hulti-Family) at $1,285.00 each f $ 100% of the amount specified above shall be paid b prior to Council approval of final plat. Please advise the Developer of these fees and due da' If you have any questions regarding these assessment~ Shall be assessed and paid prior to final acceptance Note: This fee caImot be assessed~til after TU2 the lighting plan for the proposed project submitted $292.60 per light will be assesse See attached Street Sign A~sessment sheet. I00% due pr/or to final acceptance of project. Z after J~ne 23, Developer prior ~ as a building after October the Developer please advise. project. ,lectric submits Once plan is Develop~t ~ p~ge4 STB~T SIGN ASSESSMENT for The following assessment is being ude in accordance Coppeli SUbdivision Ordinance ~ppeadix A Chapter following cost of those sign ~aterials requ/red are b pricing which is reviewed on a regular basis. No Parking Speed Limit Yield Stop Street Name Stop & Street Combo OTHER Cost breakdowns may be obtained from Public Wc request. DEVF~ES.HLP ~isk~3 for~ iCh Che ¢it~ of VIII A. The ased on current ENDED PRICE ,rks by written Revised 1/2219~