Loading...
Lakewood A-CS 921013October 13, 1992 Attn: Ken Griffin, P.E. City of Coppell/Engineering Department P.O. Box 478 Coppell, Texas 75019 Re: Lakewood Estate Coppell, Texas 91073.0 Dear Ken, Thank you for taking the time to review our second submittal of the final plat and engineering plans for the referenced tract of land. Your review was not only thorough but also was done in a very timely manner. On behalf of our client, we appreciate your effort. The review of their plans is for the release of tract "A" only. No work shall be done on tract "B" until the plans are approved by you and your staff. The changes to these plans have been outlined below to help expedite your final review· In addition to these changes, the plans have been sealed by a professional engineer in the state of Texas To avoid confusion between tract "A" and tract "B" the improvement plans associated with tract "B" have either been pulled from the set of plans or have been identified as "not in this contract." Also, during our preconstruction meeting, this issue was addressed thoroughly and each contractor is aware that these improvements are limited to tract "A" at this time. Please find below an itemized listing of all changes to these plans: 1. ) Top of manhole elevations have been shown as requested. 2. ) The street section has been revised along with the capacity calculations. 3.) Alley E is in Phase II and will be addressed at a later date· 4. ) A note has been added to the plans indicating that the 30 inch sanitary sewer line relocation is still unresolved· 5. ) The hydraulic grade line of all storm sewer systems begin at the 100 year water surface elevation. 6. ) All information regarding the pilot channel will be addressed with the phase II plans. ~- ~ . ~-:''.'V'~',:'. z::__- ~ ,-,., , ~...~.~ : ;.~ .~ ~ ~.',2 :-2 ~' 2':_~ ~ ;. -£;~ -' ~ -::2~' ' ~' ~,~ ~,3 ~ ~ } ; ~ ~ ~4~. S u~'iZ'?*.5;~ ~5. DAN' :> t.1 SC-%~;~USCH DE KE'v'I/'J ~AY' KEN~q'.OK PE DA','<>; f,l:";.,..~ a,. D: Pi ;~ 7.) The top of creek banks will be sodded as requested and not seeded. 8.) Extending the storm sewer system beyond the limits shown will be difficult to do as the pipe will be out of the ground. Filling above the pipe will result in filling within the floodplain illegally. 9.) All positive overflow swale will remain in place throughout construction and should be maintained by the builder and homeowner to prevent potential flooding in the event the storm sewer facilities fail. If you have any questions, please feel free to call. Sincerely, Kevin . P. E. Project Mgr.Associate cc: Keith Jackson P.E. Cook-Jackson Inc. Waymon Levell-LOC Estates LTD