Lakewood A-CS 921012 CITY OF COPPELL PRE-CONSTRUCTION CONFERENCE ASSIGNED INSPECTOR: I. A~TENDANCE: (See Attached List) II. PLANS FURNISHED TO: A) CITY YES NO B) CONTRACTOR YES NO C ) OWNER YES NO III. UTILITY COMPANIES NOTIFIED: A ) TELEPHONE B) GAS C } w.r.RCTRiC D) CABLE T.V. E) OTHER IV. STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS: EASEMENTS YES NO HI--AY PERMIT YES NO RAILROAD PERMIT YES NO STREET CUT PERMIT YES NO BORING PERMIT YES NO V. INSPECTION: A. DAILY INSPECTION BY ASSIGNED INSPECTOR B. AFTER HOURS AND WEEKENDS (OVERTIME) TO BE PAID BY THE CONTRACTOR "AT OVERTIME RATES". C. CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY INSPECTOR AT LEAST ~/ENTY-FOUR (24) HOURS BEFORE WATER/SANITARY St~NER/STORM SEIZER/ PAVING CONSTRUCTION BEGINS. (2) VI. TESTING OF MATERIALS: 1. DENSITIES 2. · APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR VII. STREET CLOSING REQUIRED: YES NO IF YES, CONTRACTOR TO N~TIFY THE CITY, POLICE AND FIRE DEPARTMENT SEVENTY-SWO (72) HOURS IN ADVANCE. VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: A. REQUIRED YES NO B. TRAFFIC DETOUR YES NO C. WARNING LIGHTS YES NO IF STREET DEPARTMENT HAS TO COME OUT TO MOVE THE BARRICADES AND/OR REPLACE ANY BARRICADES, THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME. IX. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY. X. INFORMATION: DEVELOPER: NAME: ADDRESS: PHONE: PROJECT MANAGER: CONSULTING ENGINEER: NAME: ADDRESS: PHONE: PROJECT ENGINEER: (3) GENERAL CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: EXCAVATING CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: PAVING CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: X. GENERAL: DATE AS-BUILT DRAWINGS - UTILITIES 1 - MYLAR 3 - BLUE LINES AS-BUILT DRAWINGS - PAVING, DRAINAGE 1 - MYLAR 3 - BLUE LINES MAINTENANCE BOND - UTILITIES PR~RATAWO~ SHEETCOMPLE~D/ STREET ASSESS~NTS WATER AND SEWER FINALED PAVING AND DRAINAGE FINALED DEVELOPMENT INSPECTION FEE: (4) LER~ER OF ACCEPTANCE WRITI'EN DATE: LETI~ER OF ACCEPTANCE WILL NOT BE WRITI~EN UNTIL THE PUNCH LIST MADE FROM THE WALK-THROUGH HAS BEEN COMPLETED AND RE-INSPECI'ED BY THE RESPECTIVE DEPARTMENTS. THIS INCLUDES SUBMI%TING: AS-BUILTS, BONDS, AND PAYING PRO-RATA. PRE-CONSTRUCTION NOTES DEFICIENT PAVEMENT, STRENGTH, THICKNESS SCREEN WALL. DISCUSS ANY CHANG]ES IN DESIGN - MUST BE IN WRITING FROM DEVELOPER'S ENGINEER TO THE CITY OF COPPF. Lr. ENGINEERING DEPARTMENT. CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERIOLOGICAL REPORTS ARE RECEIVED. COR-TEN BOLTS IN FITTINGS. FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER. STEPS IN MANHOLES. WATEROUS VALVES AND HYDRANTS OR APPROVED EQUAL. 4' BURY ON HYDRANTS. FORD DOUBLE CHECK METER LOOP (SEE CITY SPECIFICATIONS ). COLOR CODE HYDRANTS, TOP BONNET AND CAPS. CITY OF COPPELL GENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE ENGINEERING DEPARTMENT. TEMPORARY SANITARY FACILILTIES. CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HOURS). LANDSCAPE CO~4MITINENT. LANDSCAPE MAINTENANCE AGREEMENT. (5) PRE. CNSTRCTN. PZAGN ~