Loading...
MacPlaza 1 Sun-CS 960617CITY OF COPPELL DEVELOPMENT FEES Date: June 17, 1996 Project: MacArthur Plaza Block 1, Lot 1 (Sunbelt Self Storage) Water Impact Fee 2,700~00 2,700.00 (100~ due prior to Council Approval) Water Tap Inspection Fee -0- (100~ due at Issuance of Water Meter) J Wastewater Impact Fee 450~0 450.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 50 00 -0- (100~ due at Issuance of Building Permit) Utility Final Inspection Fee 50 00 -0- (100~ due at Issuance of Building Pe ~t) Water Meter Fee (Domestic) 23 -O- (100~ due at Issuance of Water Meter) Water Me, er Deposit (Non-residential) 70[00 -0- (100% due at Issuance of Water Meters)l Water Me~r Fee (Lu'igntion & Fire) 5,210110 -0- (100~ due at Issuance of Water Meters) ! Irrigation Meter Deposit 35[00 -0- (100~ due at Issuance of Water Me,ers)~ Street Sign Fee -0- (100% due prior to Acceptance of Project) Street Light Fee * information no~ -O- (100% due prior to Acceptance of Project) available [ Roadway Impact Fee 13,587t75 13,587.75 (100% due prior to Cou~c. il Approval) Comtruction Impection Fee (Due prior to precon, mtg.) need submittal ~f -0- (2~ of project cost due for private irnprovanems) contracts [ (4% of project cost due fo~,public improvement~) TOTAL $ 22,37~06 '1 I I I .~d~lO~ ~ I~,IOR TO COIJN~IL ~O¥.al~ I $ I6,737.?~ I~ I I II1[ I I I I ~ll II II~ .I Ill , /I " This fee cannot be assessed until after TU Electric submits the lighting plan for the prop~ ~xl project. Once the plan is submitted, $292.60 per light will be assessed. 0 June ~, 3996 Hart H. Cut, Superintendent of ~lic Se~ gevelopment ~ees for ~zJ-~elt Self Stora(:Te Macarthur Plaza The following fees referenced project. Water Iipact Fee: 1 - 3/4" 1 - I - ~" Total 100% due prior should be assessed and collecte Domestic Heter/s - 1 ESU's Irrigation Heter/s Fireline Meter/s ~ _~ESU's 6 ESU's ~ $450.00 ea to Council approval of the final plat WastewaterI~pact 1 - 3/4' Domestic Heter/s - 1 ESU Total 1 ESU's @ $450.00 ea = $450.00 100% due prior to Council approval of the final plat WaCer T~p Inspection Fee 4 connections ~ $50.00 each 100% due prior to issuance of building permit for resi the case of multi-family, commercial, retail, indus~ prior to issuance of meter). Sewer Tap Inspection Fee ~CeS - Lot 1 Blk. 1 d on the above 'ential. (Or in '.tal, fee is due 1 Connections ~ $50.00 each - 100% due prior to issuance of building per. it. (Rest%entiai only) Development Fees Page 2 utility Final Inspection Fee (All Development) 1 lots ~ $ 50.O0/lot - $ 50.00 100% due prior to issuance of building permit. Water WeterFee (Domestic) 1 - 3/4" Domestic Meters ~ 23.21 10O% due prior to issuance of building permit for re Ail other development fees are due prior to issuance Water WeterFee (Irrigation/Fireline) 1 - 1" Irrigation Meter/s ~ $48.30 ea - S4 2 - ~" Fireline Meter/s ~ $ $~.580.90ea Total 3.,210. 100% due prior to issuance of water meter/s. Water HetarDeposit (Hulti-Fa~ily or Eon~esidential) $ . Meters ~ _~~ = $70,00 100% due prior to issuance of water meters. Irrigation leter Deposit 1 Meters ~ $35.00 ea = $35.00 100% due prior to issuance'of water meters. SUnbelt ftde~ttal only. of =eter/s. = $ 5.161.80 10 PROIFA~T: DATE: ROA~AY IMPACT FEE CALCULAT~NS MaeJkrthur Plaza, Lot 1, Block I (Sunbelt Self Storage) 6/14/96 ROADWAY IMPACT IrEE: The. City With A Beautiful Future June 17, 1996 Johnny Cranpbell Sunbelt Serf Storage, Inc. 2904 S.H. 121 Bedford, TX 76021 RE: MacArthur l~,aza Block 1, Lot 1 (Smi~elt Self Storage) Devebpment Fee Assemnent Dear Mr. Campbell: P.O. Box 478 Coppell, Texas 75019 214-482-0022 Enclosed im a copy of the City of Coppell DeVelopment Fee ~ list~ along.wi~ a copy of the Development Fee calculations for ~Ar~hur l~--- ~ 1. Lo~ 1 (Sun.~ Self Stora~_e). Please make payment to the City of Coppell in the amount of $16,737.75 an~ forward it to Jennifer Armstrong, Fimme Director, along with a copy of the Fee ~ [list._ A copy of ~ Engineer's estimate or contract for this project will need to be provided to department so ~ consUuction impecfion fee can be verified Providing a copy of your paid receipt to our office will help us to verify fees and insure a successful beginning of this project. We look forward to project. If you have any questions, please do not hesitate to contact me. Sincerely, ~) Kehne~ M. Griffin, P.E. Assistant City Manager/City Engineer Jennifer Armstrong, Finance Director Doug Stevens, Eagineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official