Lam Lee Add-LR000224CONCRETE IhoPECTION AND COMPRESSlOh EST REPORT
CLIENT: Alice Lee CIO Reality Capital REPORT DATE: 02-24-00
PROJECT: Lam Lee REPORT NO.: 00-014.146
we: 1304 Technician: DC Rogers
:SPECiFiCATiONS PROJECT DA~A:
Strength (psi): 3000 @ 28 days Date of Placement: 02-17-00-
Slump (in.): 4-6" Sampled By: DC Rogers
Air Content (%): NtA Weather: Sunny and Warm
Concrete Temp (°F): Not to exceed 100° Supplier/Mix: Pioneer
FIELD DATA #1 .
Ticket #: 473687 Time Batched: N/A Time Sampled: 9:40AM
Slump (in.): 5" Air Content (%): NIA Unit Weight (pcf): NIA
Concrete Temp (°F): 62° Air Temp (°F): 68° Yardage (cu.yd.): 10
Location/Remarks: Piers - K- 5, K- 3.7
SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTES
NO. NO. TESTED (days) (lbs) (psi)
1-1 02-24 7 69000 2440
1 1-2 03-16 28
Set 1-3 3-16 28
1-4 Hold Hold
~' i FIELD DATA: #2
= Ticket #: Time Batched: Time Sampled:
Slump (in.): Air Content (%): Unit Weight (pcf):
Concrete Temp (°F): Air Temp (°F): Yardage (cu.yd.):
Location/Remarks:
SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTES
NO. NO. TESTED /da~sl / bs' Ipsil
2 2-2
Set 2-3
2-4
TEST RESULTS COMPLY WITH PROJECT S )NS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND
TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TEST1NG, INC.
ARE PER ASTM C31, TESTED PER ASTM C39
Soilte~h Engineering And~sting, Inc.
J~a"mes M. Perdue
Materials Testing Manager
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax