Loading...
MacPlaza 1 Sun-CS 960125DEVELOPMENT REVIEW COMMI EE ENGINEERING COMMENTS1 ITEM: to allow the d~velopment of five west side of l~lacArtkur Blvd., adjacent to the TP&L transmission line, at the request of Nathan D. Maier Consulting Engineers, Inc. 1 1 DRC DATE: January 25, 1996 and February__ 1, 1996ll. CONTACT: Ken Griffin, P.E., Assistant City Manager/City E~gtneer 004-3679) COMMENT STATUS· /pRELIMINARY Preliminary Plat 1. Provide minimum f'mish floor elevations for each building on Block 1, Lot 1. The minimum f~nish floor to be 2' about the 100-year flood elevation. 2. Label easement adjacent to MacArthur Blvd. 3. Show sight visibility triangle easements at all ingress/egress points as per the City Ordinance. 4. The 20' water easement shown through Block 1, Lot I is not needled since it will be a private line. Provide a 10'x10' easement for the detector chec~ vaults adjacent to MacArthur Blvd. Also, wastewater access devices and water meters for each lot need to be located in either the right-of-way or an easement. 5. The word "plat" in the title block is misspelled. 6. Water, sewer & roadway impact fees will be required. 7. Show turning radius for fire lane in Block 1, Lot 1. 8. Deceleration lanes will be required to service the access between of Lot $, therefore, additional easements will be required to be de, utilities and landscaping. 9. The fire lane should be also labeled as a Common Access Easem, 10. Note on Riverchase Drive right-of-way needs to say "Previously Pg.__". Site Plan There is a concern about the proposed median opening for the sell to visibility. You should evaluate the median opening in regal taking into consideration the existing berms, landscaping and othe ,o's 2 & 3 and south icated for sidewalks, ~nt. abandoned Vol. 'storage with respect .ds to visibility; and existing conditions. Page 2 If the median opening is permitted, both north and south bound h ft turn lanes will be required to be constructed. Also, the opening must be lined up with the. existing driveway on the east side of MacArthur Blvd. Have you evaluated the poss~ty of taking the access for thl.n development from the abandoned River~hase Drive right-of- way at the south end of the property? I 2. Provide deceleration lanes south of Lot 5 and between Lots 2 & 3. Show the fire lane to be paved between Lots 2 & 3 and south ofLot 5. 4. Because of the proposed traffic p. atterns along the east side of tl~ development and adjacent developments, Engineering recommends that there be n~ cross access on the east side and that ali access for the developments be from the we~t side off of the fire lane/common access easements. I . 5. Extend landscape buffers to the east to prohibit cross access and ,..* "how landscaping m buffer between Sunbelt and Sonic, Speedee Lube, City Garage ~u id vacant property. Water & Sewer Plan 1. Relocate sprinkler heads out of driveway for Lot 3. 2. There needs to be discussion about extension of water lines an, hydrant s and adjacent to the fire lane. Landscaping Master Plan 1. Show the deceleration lanes. 2. Landscaping taller than 30" shall not be located in visibility tria~ 3. Show brick pavers. 4. Extend landscape buffers to east to prohibit cross access and buffer between Sunbelt and Sonic, Speedee Lube, City Garage placement of fire how landscaping in ~d vacant property.