Loading...
Lam Lee Add-LR000301 CONCRETE INsPECI'ION AND COMPRESSION T T REPORT Client: Alice Lee c/oRealty Capital Corporation Work Order Number: 00-1381 Project: 00-014 Lam Lee Page 1 of 2 Report Number: 00-014.152 SPECIFICATIONS PROJECT DATA Streng~ il~S~): - ~4000 Psi~-2~-d-a~ 'Date of Pla~,ement: 311/2000 Slump(in.): 4-6 'Salnpled by: D C Rogers Air Content(%): Weather: Cloudy and warm Concrete Temp(F): 100° Supplier/Mix: Pioneer FIELD DATA SET #1 Tick~i #i .... 47-~2~4i ' 'Tim~B,;t~,~e~.7- .......... 3:50:00 AM 'Time ~m-pl~d: .... ~:'~5~30 A-I~ Slump (in.): 5 .Air Content: Unit Weight (pcf): Concrete Temp(F): 60° Air Temp (F): 55° Yardage: i 30 Location/Remarks: Building Slab - 5' west of D-12 SET CYLINDER DATE AGE MAX LOAD STRENGTH TEST CYLINDER NOTES NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE 1 01 3/7/2000 7 106000 3750 1 02 3/28/2000 28 1 03 3/28/2000 28 1 04 Hold FIELD DATA SET #2 Ticket #: 474257 Time Batched: 5:57:00 AM Time Sampled: 6:57:00 AM Slump (in.): 6 Air Content: Unit Weight (pcf): Concrete Temp(F): 60° Air Temp (F): 55° Yardage: 190 Location/Remarks: Building Slab 10' east of D-9 SET CYLINDER DATE AGE MAX LOAD STRENGTH TEST CYLINDER NOTES NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE 2 01 3/7/2000 7 96000 3400 2 02 3/2812000 28 2 03 3/28/2000 28 2 04 Hold NORMAL CYLINDER SIZE: 5X12, AREA:28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELd) TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C 138, C143. C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM SOII~ TECH EI~NEEI~I~r)J3 ANI~ TESTING, INC. ~Ja~; M. Perdue ~ltedals Testing Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax CONCRETE INSPEC I ION AND COMPRESSION TE,sT REPORT Client: Alice Lee c/oRealty Capital Corporation Work Order Number: 00-1381 Project: 00-014 Lam Lee Page 2 of 2 Report Number: 00-014.152 ........... S-~ E~i~=ic~T~i~ ............ PROJECT DATA ..... ,~at~ of Pl'acement: '3/1/2000 Strength (psi): 4000 Psi Slump(in.): 4-6 - Sampled by: D C Rogers Air Content(%): .......... ,Weather: - - Cloudy and Warm Concrete Temp(F): 100° 'Supplier/Mix: Pioneer FIELD DATA SET #3 8:57:00 AM Ticket #: 474279 Time Batched: 8:20:00 AM Time Sampled: Slump (in.): 5 ' Air Content: Unit Weight (pcf): 0 Concrete Temp(F): 61 ° Air Temp (F): - 'Yardage~' ........ 390 Location/Remarks: Building slab SET CYLI'NDER I~ATE- - ,~GE- ' MAX LOAD -~TRENGT~I-~'ES~T '- ' ~YLINbER NOTES NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE ~-- (~1- ' 3/7~2~0~"- ~--- ~):~0-00 .... 3~46-0 ........... _ .................. 3 02 312812000 28 3 03 312812000 28 3 04 Hold FIELD DATA SET #4 Tick~{ #~' ........... ~7~28-~ Time Batched: 9:05:00 AM Time Sampled: i 10:00:00 AM Slump (in.): 5 Air Content: Unit Weight (pcf): 0 Concrete Temp(F): 60' Air Temp (F): 60° Yardage: 450 Location/Remarks: Building Slab 8' east of D-4 SET C~;LIND-ER D-ATE AGE MAX LOAD STRENGTH- ':DE$:~ CYLINDER NOTES NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE 4 02 3~28~2000 28 4 03 312812000 28 4 04 Hold NORMAL CYLINDER SIZE: 5X12, AREA;28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES, TEST RESULTS COMPLY WtTH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM SOIL TECH ENGINEERING AND TESTING, INC. James M. Perdue Materials Testing Manager 2502 Gravel Drive · Fort Worth, Texas 76118 ° 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax