Loading...
Lakewood A-CS 920911September 11, 1992 Austin Paving Company L.H. Lacy Company Mario Sinacola & Sons Excavating, Inc. Glenn Thurman, Inc. Site Concrete XIT Paving & Construction, Inc. Re: LAKEWOOD ESTATES - Coppell, Texas Paving Bids 91073-0 Gentlemen: You are invited to submit a proposal for construction of pavement facilities in the subject addition. All labor and materials necessary to complete the work indicated on the enclosed engineering plans per City of Coppell Standards and Specifications should be included in unit prices. The Owner reserves the right to reject any or all bids and waive formalities in the bidding procedure. Bids will be received until 4:00 p.m. Monday, September 21, 1992 and should be addressed to: L.C. ESTATES, LTD. c/o Unzicker, Schnurbusch & Associates 8700 Stemmons Freeway, Suite 400 Dallas, Texas 75247 Attached is a copy of our estimate of the bid quantities. All work is to be constructed under Contract with the Owner per Contract Documents provided by Owner. Construction staking and grade verification will be provided by the Owner through Unzicker, Schnurbusch & Associates, Inc. The Owner reserves the right to backcharge the Contractor for excessive retesting, restaking and/or reverification. Include in your proposal as separate line items the cost of payment and performance bonds to the Owner as well as the required maintenance bond to the City of Coppell. Bids will not be taken unless a time of construction has been included (in working days). Please be aware that the City of Coppell has recently revised their standard details. Sincerely, Kevin Ray ~endrick, P.E. C iley,\..E. Project Manager · Associate Pro]ec~ Manage~3 KRK/bp xc: Mr. Waymon Levell / L.C. ESTATES, LTD. Mr. Larry Davis / City of Coppell, Engineering Dept. Mr. Ken Griffin, P.E. / City of Coppell, Engineering Dept. Mr. Keith Jackson, P.E. / Cook-Jackson, Inc. BID QUANTITIES LAKEWOOD ESTATES CITY OF COPPELL L.C. ESTATES, LTD. SEPTEMBER 11, 1992 PAVING* 20,100 S.Y. 6" - 3000 psi Reinforced Concrete Street Pavement with Curb and Gutter and Barrier-Free Ramps 110 S.Y.- Pavestone "Streetscape" at Subdivision Entrances 6,600 S.Y. 6"/4"/6" - 3600 psi Reinforced Concrete Alley Pavement 29,150 S.Y. Lime Stabilized Subgrade 394 TON Hydrated Line (27 lb/SY) 460 L.F. Sawcut and Remove Existing Pavement 465 S.Y. 4" - 3000 psi Reinforced Concrete Sidewalk with 1" Sand Cushion and Compacted Subgrade 1 L.S. Materials Testing and Subgrade Lime Series 1 L.S. Payment and Performance Bond to Owner 1 L.S. Maintenance Bond to the City of Coppell * Ail bid items to be constructed per the current City of Coppell standards and specifications. Bid items to include all means of construction required for proper installation (complete in place), including but not limited to: labor, supervision, equipment, tools, materials, backfill, compaction, final cleanup and acceptance. Traffic control to be provided and maintained by Contractor throughout construction at Contractor's expense. Paving construction is scheduled to begin on this site on October 22, 1992. Please include with your bid a statement that you will comply with the start date and your estimated completion date.