Lam Lee Add-LR000301 (2) CONCRETE INSPECTION AND COMPRESSION TEST REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-1351
Project 00-014 Lam Lee pg 1 of 2 Report Numbe 00-014.152
SPECIFICATIONS PROJECT DATA
Strength (psi): 4000 Psi ~ 28 days Date of Placement: 3/1/00
Slump(in.): 4-6 !Sampled by: D C Rogers
Air Content(%): Weather: Cloudy and warm
Concrete Temp(F): 100° iSupplier/Mix: Pioneer
FIELD DATA SET # 1
Ticket #: 474241 Time Batched: 3:50:00 AM Time Sampled: 4:15:00 AM
Slump (in.): 5 A r Content: Unit Weight (pcf):
Concrete Temp(F): -- 60° Air Temp (F): 55° Yardage: 30
Location/Remarks: Building Slab - 5' west of D-12
SET CYLINDER DATE AGE MAX LOAD '.STRENGTH TEST CYLINDER NOTES
NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE
1 O1 3~8~00 7 106000 3750
1 02 3~29~00 28 142000 5022 ................
1 03 3~29~00 28 139000 4920
1 04 Hold
FIELD DATA SET #2
5:57:00 AM Time Sampled: 6:57:00 AM
Ticket #: 474257 ,Time Batched:
Slump (in.): 6 Air Content: Unit Weight (pcf):
Concrete Temp(F): 60-; ...... Air Temp (F): 55° Yardage: 190
Location/Remarks: Building Slab 10' east of D-9 ...........................................................
SET CYLINDER DATE AGE MAX LOAD ,STRENGTH, TEST CYLINDER NOTES
NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE
'2 0~_ ..... 31__81_0_0~_ 7_ _ 9-600-0- ..... --34---0-0~
2 02 3~29~00 28 ].37000 4850
2 ' -53 - -372-9/-0% --- -28-- ' :1.~70~)0- .... 4~-~6
2 04 Hold
~,NORMAL CYLINDER SIZE 5X12, AREA:28,27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS CO~PLY
WtTH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
ASTM STANDARDS: C138, C143, C172, C231. C~'LINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM
SOILTECH ENGINE~ING AND TESTING, INC.
-~neral Manager
2502 Gravel Drive · Fort Worth, Texas 76118 ° 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax
CONCRETE INSPECTION AND COMPRESSION TE T REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-1381
Project 00-014 Lam Lee pg 2 of 2 Report Numbe 00-014.152
SPECIFICATIONS PROJECT DATA
Strength (psi): :4000 Psi ,Date of Placement: 3/1/00
Slump(in.): 4-6 Sampled by: D C Rogers
Air Content(%): iWeather: ....... Cloudy and Warm
Concrete Temp(F): :100° ;.Supplier/Mix: Pioneer
FIELD DATA SET #3
Ticket #: 474279 Time Batched: 8:20:00 AM Time Sampled: 8:57:00 AM
Slump (in.): 5 Air Content: Unit Weight (pcf): 0
Concrete Temp(F): 61 ° Air Temp (F): Yardage: 390
Location/Remarks: iBuilding slab
SET CYLINDER DATE AGE MAX LOAD STRENGTH. TEST CYLINDER NOTES
NO. NO. TESTED (days) (lbs) (psi) RESULT ' SOURCE
3 01 3/8/00 7 103000 3460 ;
3 02 3/29/00 28 141000 4990
3 03 3/29/00 28 139000 4920
3 04 Hold
FIELD DATA SET #4
Ticket #: i 474287 Time Batched: 9:05:00 AM Time Sampled: 10:00:00 AM
Slump (in.): 5 Air Content: Unit Weight (pcf): 0
Concrete Temp(F): 60° Air Temp (F): 60° Yardage: 450
Location/Remarks: Building Slab 8' east of D-4
SET CYLINDER DATE AGE MAX LOAD STRENGTH TEST CYLINDER NOTES
NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE
4 01 3/8/00 7 109000 3860
4 02 3/29/00 28 140000 4950
4 03 3/29/00 28 134000 4740
4 04 Hold
NORMAL CYLINDER SIZE: 5X12, AREA:28.27~I. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY
WiTH PROJECT SPECIFICATIONS UNLESS INDICATED 'I~ON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ABTM
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax