Loading...
Lam Lee Add-LR000313 (2) CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Alice Lee cio Reality Capital Corp. REPORT DATE: 03-13-00 PROJECT: Lam Lee REPORT NO.: 00-014.138 WO: 1263 Technician: TJ sPECIFICATIONS PR~ECT DATA Stren.qth (psi): 135.000 PSI Date of Placement: 102-12-00 Slump (in.): Sampled By: I T Jackson Air Content (%): / N/A Weather: I Cool / Partly Cloudy Concrete Temp (°F): I Not to Exceed 100° Supplier/Mix: ~ Butler FIELD DATA #t Ticket#: 140.0,,8480 ITime Batched: 19:00 AM ITime Sampled: [10:00 AM Slump(in.): 16.5' lAir Content (%): IN/A I Unit Wei~lht (Pcf): Concrete Temp (°F): 151° lair Temp (°F): 143° I Yardage (cu.yd.): ]60 Location/Remarks: Piers - C/11 SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTES NO. NO. TESTED (days) (lbs) (psi) 1-1 02-19 7 74000 2620 1 1-2 03-11 28 101000 3570 Set 1-3 03-11 28 104500 3700 1-4 Hold Hold FIELD DATA #2 Ticket #: I Time Batched: I Time Sampled: Slump (in.): lAir Content (%): I Unit Wei~lht (pcf): Concrete Temp (°F): lair Temp (°F): l Yardage (cu.yd.): Location/Remarks: SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTES NO. NO. TESTED (days) (lbs) (psi) 2-1 2 2-2 Set 2-3 2-4 ~OMINAL CY .INDER SIZE: 6 X 12,~ ~REA: 28.27 sq. in. UN .ESS NO_T_E_D H_E.R_E:_T'~_ I~_E. "_.A'.' _C_O.N._E? ~.F~.._C_T.U.P,..E. ,U..N_L_E_~S.I.N~,DI~C~,~T~E...D~O.T..H~E~,,WI.,.~E~! ,N ~.~.~ TEST RESULTS COMPLY WITH PROJECT $ ;ATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING TESTING, iNC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH EN:51NEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM C39 Soiltech Engineering And Testing, Inc. "J~,(es M Perdue Materials Testing Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817,595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax