Loading...
WA9302-LR 960108 (8)[EOTECHNICAL E GEE Consultants, Inc. EI NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: January 8, 1996 Date Concrete Placed: December 29, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 62 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Dome Panels MATERIALS ~.,~e/ ~h ~.. INSPECTION DATA Description (Lbs./Cu. Yd) Mix Number: 685 Time Sample Batehed: 11:45 aan Cement: Time Sampled: 12:45 pm Sample Location: Panel No. 6F-l, 6E-l, 5E-I, 4D-I Fly Ash: TruckJTieket No: 603/17230 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 46°F Fine Aggregate: Concrete Range: 51 °F Slump Range (inches): 71/:" Admixtures: Weather Conditions: Partly Cloudy 1 Time Started: 8:00 am 2 Time Completed: 6:00 pm Added Water: Sample Air Content (%): 3% Total Cubic Yards Placed: 40 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Tolal L~td Compressive Strength Remar~ Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CWT 237 7%" 7 01/05/96 162,920 5,760 CWT 238 7%" Hold Hold CWT 239 7%" Hold Hold Test Methods Utilized Fractuse Regular Cyllndem Made By: W.I. ASTM C-31 ,C-39,C- t 43 tUnless Not~l Otl~rwh=) Remarks and/or Distribution: Note: Slump before super plasticizer was 3" cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendrieks - Shimek, Iacobs and Finklea g!~ ~ lilt_ Reviewed by: ~ ,