Loading...
Lam Lee Add-LR000313 (3) CONCRETE IN~,-'ECTION AND COMPRESSION ~. EST REPORT CLIENT: Alice Lee CIO Reality Capital REPORT DATE: 03-13.00 PROJECT: Lam Lee REPORT NO.: 00-014.137 we: 1255 Technician: T. J SPECIFICATIONS PROJECT DATA Placement: 102-11-00 Date of 5" Sampled By: I T Jackson Air Content (%): Weather: I Cool and Partly cloudy Concrete Tamp (°F): Supplier/Mix: ~ Pioneer FIELD [tATA #1 Ticket#: 14,4,0955 ITime Batched: 10:30 AM ITime Sampled: [11:15AM 6' lAir Content (%): I Unit Wei~lht (pcf): Concrete Tamp (°F): 55° I Air Tamp (°F): 51° ~ Yardage (cu.yd.): 40 ocation/Remarks: Piers F.5/1 SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTES NO. NO. TESTED (days) (lbs) (psi) 1-1 02-18 7 79000 2800 1 1-2 03-10 28 110000 3890 Set 1-3 3-10 28 107000 3780 1-4 Hold Hold FI~ n DATA #2 Ticket #: I Tirne Batched: I I Time Sampled: Slump (in.): lair Content (%): I Unit Weight (pcf): Concrete Ternp (°F): lair Tamp (°F): ~Yardage (cu.yd.): SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTES NO. NO. TESTED (days) (lbs) (psi) 2-1 2 2-2 Set 2-3 2-4 , EA 28 27 s n UN ESS NOTED HERE' TYPE"A" CONE I;RACTURE UNLESS INDIC,~ TED OTHERWISE IN NOTES. NOMINAL CY .INDER SIZE: 6 X 1_2_,_~R__.': _;:__.~'.A ;~,~; ............. ,-, ~A¥~ ,,~a C.~l~ll:)l IAId~.l=" IN NC)TI::~ FIELD TESTS BY SOILTECH ENG!NEE_RING_A_.N. D_ ... TEST RESULTS COMPLY WITH PROJECT SPEC :ATIONS UNLESS NDIC. TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM C39 Soiltech Engineering And Testing, Inc. .i',~'a~es M. ~erdue l~aterials Testing Manager 2502 Gravel Drive · Fort Worth, Texas 76118 ° 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax