Lam Lee Add-LR000313 (3) CONCRETE IN~,-'ECTION AND COMPRESSION ~. EST REPORT
CLIENT: Alice Lee CIO Reality Capital REPORT DATE: 03-13.00
PROJECT: Lam Lee REPORT NO.: 00-014.137
we: 1255 Technician: T. J
SPECIFICATIONS PROJECT DATA
Placement: 102-11-00
Date
of
5" Sampled By: I T Jackson
Air Content (%): Weather: I Cool and Partly cloudy
Concrete Tamp (°F): Supplier/Mix: ~ Pioneer
FIELD [tATA #1
Ticket#: 14,4,0955 ITime Batched: 10:30 AM ITime Sampled: [11:15AM
6' lAir Content (%): I Unit Wei~lht (pcf):
Concrete Tamp (°F): 55° I Air Tamp (°F): 51° ~ Yardage (cu.yd.): 40
ocation/Remarks: Piers F.5/1
SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTES
NO. NO. TESTED (days) (lbs) (psi)
1-1 02-18 7 79000 2800
1 1-2 03-10 28 110000 3890
Set 1-3 3-10 28 107000 3780
1-4 Hold Hold
FI~ n DATA #2
Ticket #: I Tirne Batched: I I Time Sampled:
Slump (in.): lair Content (%): I Unit Weight (pcf):
Concrete Ternp (°F): lair Tamp (°F): ~Yardage (cu.yd.):
SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTES
NO. NO. TESTED (days) (lbs) (psi)
2-1
2 2-2
Set 2-3
2-4
, EA 28 27 s n UN ESS NOTED HERE' TYPE"A" CONE I;RACTURE UNLESS INDIC,~ TED OTHERWISE IN NOTES.
NOMINAL CY .INDER SIZE: 6 X 1_2_,_~R__.': _;:__.~'.A ;~,~; ............. ,-, ~A¥~ ,,~a C.~l~ll:)l IAId~.l=" IN NC)TI::~ FIELD TESTS BY SOILTECH ENG!NEE_RING_A_.N. D_ ...
TEST RESULTS COMPLY WITH PROJECT SPEC :ATIONS UNLESS NDIC.
TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC.
ARE PER ASTM C31, TESTED PER ASTM C39
Soiltech Engineering And Testing, Inc.
.i',~'a~es M. ~erdue
l~aterials Testing Manager
2502 Gravel Drive · Fort Worth, Texas 76118 ° 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax