Lam Lee Add-LR000317 (2) CONCRETE INSPECTION AND COMPRESSION TEST REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-1512
Project 00-014 Lam Lee Report Numbe 00-014.159
SPECIFICATIONS I PROJECT DATA
Strength (psi): i4000 PSI [Date of Placement: 3/17/00
Slump(in.): !4-6 Sampled by: LB
:Air Content(%): IWeether: Overcast & Cool
Concrete Temp(F): 'Not to exceed 100° 'Supglier/Mix: Pioneer / 9349
FIELD DATA SET # 1
'Ticket #: 474817 !Time Batched: i 9:35:00 AM Time Sampled: 10:15:00 AM
3/4 Air Content: I iUnit Weight (pcO:
lSlump
(in.):
4
68' ~Air Temp (F): I 46° !Yardage: 10
Concrete
Temp(F):
iLocationlRemarks: 'Grade beam west wall of office.
SET CYLINDER: DATE AGE MAX LOAD ISTRENGTH TEST CYLINDER NOTES
NO. NO. :TESTED (days) (lbs) (psi) RESULT SOURCE
I 01 i3/24/00, 7 136500 4830
1 02 i4/14/00i 28 166000 I 5870
1 03 '~4/14/001 28 171000 i 6050
1 04 ~ Hold ~
NORMAL CYLINDER SIZE: 5X12, AREA;28.275q. in. UNLESS NOTED HERE: TYPE 'A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY
WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE' IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
ASTM STANDARDS: C138, C143, C172, C231. C, YLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM
SOILTECH ENGINEERING AND TESTING, INC.
James M. Perdue
General Manager
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax