Loading...
WA9302-LR 960107'EOTECHNICAL E GEE Consultants, Inc. E~ NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: January 7, 1996 Date Concrete Placed: December 29, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 61 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Dome Panels MATERIALS so~ ..~b ~¢~. INSPECTION DATA Description (Lbs./Cu. Yd) Mix Number: 685 Time Sample Batehe& 10:28 atn Cement: Time Smnpled: 12:00 pm Sample Location: Panel No. 6C-1, 4C-1, 5C-I, 6D-1,5D-1 Fly Ash: Truck/Ticket No: 104/17222 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 47°F Fine Aggregate: Concrete Range: 51 °F Slump Range (inches): 4~i" Admixtures: Weather Conditions: Partly Cloudy 1 Time Started: 8:00 am 2 Time Completed: 6:00 pm Added Water: Sample Air Content (%): 3% Total Cubic Yards Placed: 30 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Total Load Compresslye Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CWT 234 4~" 7 01/05/96 147,620 5,220 CWT 235 4~" Hold Hold CWT 236 43A" Hold Hold Test Methods Utilized Fracture Regular Cylinders Made By: W.I. ASTM C-31 ,C-39,C-143 (Unless Not~l Otherwick) Ren~rks and/or Distribution: Note: Slump before super plasticizer was 3 - co: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hend~cks - Shimek, Jacobs and FinIdea ~ ~ ~ Reviewed by: ~ ~