Loading...
MacPlaza1 City-CS 960627 (2)P,O. Box 478 Coppell, Texas 75019 214-462-0022 June 27, 1996 Greg Mason Zell Three, Inc. 1190 Explorer Street Duncanville, TX 75137 RE: MacArthur Plaza Block 1, Lot 3 (City Garage) Development Fee Assessment Revis Dear Sir: Enclosed is a copy of the City of Coppell revised Development Fee Assessment list, along with a copy of the Development Fee calculations for MacArthur Plaza Block 1, Lot 3 (City Garage). Please make payment to the City of Coppell in the amount of $6,435.60 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, ~) .~ ...~rif~~ Kenneth M. riffin, P.E. Assistant City Manager/City Engineer CCi Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official CITY OF COPPELL DEVELOPMENT FEES Date: Project: June 27, 1996 (Revised) MacArthur Plaza Block 1, Lot 3(City Garage) TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 2,025.00 2,025.00 (100% due prior to Council Approval) Water Tap Inspection Fee 150.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee 450.00 450.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 23.21 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) 30.00 -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) 1,462.29 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Roadway Impact Fee 3,960.60 3,960.60 (100% due prior to Council Approval) Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0- (2 % of project cost due for private improvements) contracts (4 % of project cost due for public improvements) TOTAL $ 8,236.10 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 6,435.60 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL ENGINEERING HEHORANDUH DATE: TO: FROH : RE: June 26, 1996 Mike Martin, Assistant City Engineer Matt M. Cast, Superintendent of Public Services Development Fees for City Garage (.~.~,~ The following fees should be assessed and collected on the above referenced project. Water Impact Fee: i -5/6 I -518 1 -6 Total 4.5 Domestic Meter/s = Irrigation Meter/s = Fireline Meter/s = 1 ESU's 1 ESU's 2.5 ESU's ESU's @ $450.00 ea = $ 2,025.00 100% due prior to Council approval of the final plat. Wastewater Impact 1 - 5/8 Domestic Meter/s = i ESU's Total 1 ESU's ~ $450.00 ea = $450.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 3 ConneCtions ~ $50.00 each = $ 150.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 1 Connections @ $50.00 each = $ 50.00 100% due prior to issuance of building permit. (Residential only) Development Fee8 Page 2 Utility Final Inspection Fee (All Development) 1 lots ~ $ 50.O0/lot = $ 50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 5/8 Domestic Meters ~ $23.21 = S 23.21 100% due prior to issuance of building permit for residential only. All other development fees are due prior to issuance of meter/s. Water Meter Fee I - 5/8 1 - 6 (Irrigation/Fireline) Irrigation Meter/s @ $ 23.21 ea Fireline Meter/s @ $ 1439.00 Total 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) 1 Meters @ $30.00 ea = $ 30.00 100% due prior to issuance of water meters. = $ 23.21 ea = $ 1,439.00 $1,462 . 29 Irrigation Meter Deposit 1 Meters ~ $35.00 ea = $ 35.00 100% due prior to issuance of water meters.