MacPlaza1 City-CS 960627 (2)P,O. Box 478
Coppell, Texas 75019
214-462-0022
June 27, 1996
Greg Mason
Zell Three, Inc.
1190 Explorer Street
Duncanville, TX 75137
RE: MacArthur Plaza Block 1, Lot 3 (City Garage)
Development Fee Assessment Revis
Dear Sir:
Enclosed is a copy of the City of Coppell revised Development Fee Assessment list, along with a
copy of the Development Fee calculations for MacArthur Plaza Block 1, Lot 3 (City Garage).
Please make payment to the City of Coppell in the amount of $6,435.60 and forward it to Jennifer
Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the
Engineer's estimate or contract for this project will need to be provided to our department so the
construction inspection fee can be verified
Providing a copy of your paid receipt to our office will help us to verify payment of the required
fees and insure a successful beginning of this project. We look forward to working with you on this
project. If you have any questions, please do not hesitate to contact me.
Sincerely, ~)
.~ ...~rif~~
Kenneth M. riffin, P.E.
Assistant City Manager/City Engineer
CCi
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
June 27, 1996 (Revised)
MacArthur Plaza Block 1, Lot 3(City Garage)
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee 2,025.00 2,025.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 150.00 -0-
(100% due at Issuance of Water Meter)
Wastewater Impact Fee 450.00 450.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee 50.00 -0-
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee 50.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) 23.21 -0-
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-residential) 30.00 -0-
(100% due at Issuance of Water Meters)
Water Meter Fee (Irrigation & Fire) 1,462.29 -0-
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit 35.00 -0-
(100% due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(100% due prior to Acceptance of Project)
Street Light Fee * information not -0-
(100% due prior to Acceptance of Project) available
Roadway Impact Fee 3,960.60 3,960.60
(100% due prior to Council Approval)
Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0-
(2 % of project cost due for private improvements) contracts
(4 % of project cost due for public improvements)
TOTAL $ 8,236.10
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 6,435.60
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPELL ENGINEERING
HEHORANDUH
DATE:
TO:
FROH :
RE:
June 26, 1996
Mike Martin, Assistant City Engineer
Matt M. Cast, Superintendent of Public Services
Development Fees for City Garage (.~.~,~
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
i -5/6
I -518
1 -6
Total 4.5
Domestic Meter/s =
Irrigation Meter/s =
Fireline Meter/s =
1 ESU's
1 ESU's
2.5 ESU's
ESU's @ $450.00 ea = $ 2,025.00
100% due prior to Council approval of the final plat.
Wastewater Impact
1 - 5/8 Domestic Meter/s = i ESU's
Total 1 ESU's ~ $450.00 ea = $450.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
3 ConneCtions ~ $50.00 each = $ 150.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
1 Connections @ $50.00 each = $ 50.00
100% due prior to issuance of building permit. (Residential only)
Development Fee8
Page 2
Utility Final Inspection Fee (All Development)
1 lots ~ $ 50.O0/lot = $ 50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 5/8 Domestic Meters ~ $23.21 = S 23.21
100% due prior to issuance of building permit for residential only.
All other development fees are due prior to issuance of meter/s.
Water Meter Fee
I - 5/8
1 - 6
(Irrigation/Fireline)
Irrigation Meter/s @ $ 23.21 ea
Fireline Meter/s @ $ 1439.00
Total
100% due prior to issuance of water meter/s.
Water Meter Deposit (Multi-Family or Non-Residential)
1 Meters @ $30.00 ea = $ 30.00
100% due prior to issuance of water meters.
= $ 23.21
ea = $ 1,439.00
$1,462 . 29
Irrigation Meter Deposit
1 Meters ~ $35.00 ea = $ 35.00
100% due prior to issuance of water meters.