Loading...
WA9302-LR 960107 (2)[EOTECHNICALE IGEE Consultants, Inc. EI NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: January 7, 1996 Date Concrete Placed: December 29, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank concrete Report No.: 60 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Dome Panels MATERIALS sourc~ ~h ,~. INSPECTION DATA Description (Lbs ./Cu. Yd) Mix Number: 685 Time Sample Batched: 9:51 am Cement: Time Sampled: 11: 10 am Fly Ash: Sample Location: Panel No. 3A-1, 3B-I, 4B-I, 5B-l, 6B-l, 3C-1 Coarse Aggregate: Truck/Ticket No: 602/17217 Intermediate Aggregate: Temperature: Fine Aggregate: Ambient Range: 46°F Concrete Range: 55°F Admixtures: Slump Range (inches): 7V:" 1 Weather Conditions: Partly Cloudy 2 Time Started: 8:00 am Added Water: Time Completed: 6:00 pm Sample Air Content (%): 5% Total Cubic Yards Placed: 20 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Total Load Comprgssivg Strgngth Rgmarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CWT 230 7~/~" 7 01/05/96 110,620 3,910 CWT 231 7~/~" Hold Hold CWT 233 7~h" Hold Hold Test Methods Utillz~ Fracture Regular Cylinders Made By: W.I. ASTM C-31,C-39, C-143 (Unless Noted Oth=fwise) R~narlcs and/or Distribution: Note: Slump before super plasticizer was 41/2" cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea ~ (3m~m~m~, bt_ Reviewed by:~.~