Loading...
MacPlaza1 City-CS 960617The City With A Beautiful Future June 17, 1996 P,O. Box 478 Coppell, Texas 75019 214-462-0022 Greg Mason Zell Three, Inc. 1190 Explorer Street Duncanville, TX 75137 RE: MacArthur Plaza Block 1, Lot 3 (City Garage) Development Fee Assessment Dear Sir: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee calculations for MacArthur Plaza Block 1, Lot 3 (City Garage). Please make payment to the City of Coppell in the amount of $5,310.60 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely,~z~°vq ~/~~ Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official CITY OF COPPELL DEVELOPMENT FEES Date: Project: June 17, 1996 MacArthur Plaza Block 1, Lot 3(City Garage) TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 900.00 900.00 (100% due prior to Council Approval) Water Tap Inspection Fee 100.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee 450.00 450.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 23.21 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) 30.00 -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) 23.21 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Roadway Impact Fee 3,960.60 3,960.60 (100% due prior to Council Approval) Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0- (2 % of project cost due for private improvements) contracts (4% of project cost due for public improvements) TOTAL $ 5,622.02 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 5,310.60 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPBnn ENGINEERING MEHORANDUM DATE: TO: FROM: RE: 6/4/96 Mike Martin, Assistant City Engineer Matt M. Cast, Superintendent of Public Services Development Fees for Macarthur Plaza City Garage Lot 3 Blk. 1 The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 3/4" Domestic Meter/s = 1 ESU's 3/4" Irrigation Meter/s = 1 ESU's Fireline Meter/s = ESU's Total 2 ESU's @ $450.00 ea = $ 900.00 100% due prior to Council approval of the final plat. Wastewater Impact 1 - 3/4" Domestic Meter/s = 1 ESU's Total 1 ESU's @ $450.00 ea = $450.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections @ $50.00 each = $100.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 1. Connections ~ $50.00 each = $ 50.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (All Development) 1 lots @ $ 50.O0/lot = $50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 3/4" Domestic Meters @ $23.21 = $23.21 100% due prior to issuance of building permit for residential onlyo Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 3/4" Irrigation Meter/s @ $23.21 ea - Fireline Meter/s @ $ ea Total $23.21 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-F~m~ly or Non-Residential) 1 Meters @ $30.00 ea = $30.00 100% due prior to issuance of water meters. = $23.21 = ~ $ Irrigation HeterDeposit 1 Meters @ $35.00 ea = $35.00 100% due prior to issuance of water meters. garage ROADWAY IMPACT FEE CALCULA'I ~ONS PROJECT: DATE: MacArthur Plaza, Lot 3, Block I (City Garage) 6/17/96 ROADWAY IMPACT FEE: Service Area * Catel~ory ** Land Use *** Buildinl~ Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit *** Fee per Vehicle Mile 7 Commercial Automotive Care Center 4,600 4.6 2.87 $300 Roadway Impact Fee due = (Development Units) x iVehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $3,960.60 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Trip Generation, January 1991, ITE 5th Edition Automobile Care Center (840) Weekday, Peak Hour, Average Rate)