MacPlaza1 City-CS 960617The City With A Beautiful Future
June 17, 1996
P,O. Box 478
Coppell, Texas 75019
214-462-0022
Greg Mason
Zell Three, Inc.
1190 Explorer Street
Duncanville, TX 75137
RE: MacArthur Plaza Block 1, Lot 3 (City Garage)
Development Fee Assessment
Dear Sir:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee calculations for MacArthur Plaza Block 1, Lot 3 (City Garage).
Please make payment to the City of Coppell in the amount of $5,310.60 and forward it to Jennifer
Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the
Engineer's estimate or contract for this project will need to be provided to our department so the
construction inspection fee can be verified
Providing a copy of your paid receipt to our office will help us to verify payment of the required
fees and insure a successful beginning of this project. We look forward to working with you on this
project. If you have any questions, please do not hesitate to contact me.
Sincerely,~z~°vq ~/~~
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
June 17, 1996
MacArthur Plaza Block 1, Lot 3(City Garage)
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee 900.00 900.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 100.00 -0-
(100% due at Issuance of Water Meter)
Wastewater Impact Fee 450.00 450.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee 50.00 -0-
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee 50.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) 23.21 -0-
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-residential) 30.00 -0-
(100% due at Issuance of Water Meters)
Water Meter Fee (Irrigation & Fire) 23.21 -0-
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit 35.00 -0-
(100% due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(100% due prior to Acceptance of Project)
Street Light Fee * information not -0-
(100% due prior to Acceptance of Project) available
Roadway Impact Fee 3,960.60 3,960.60
(100% due prior to Council Approval)
Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0-
(2 % of project cost due for private improvements) contracts
(4% of project cost due for public improvements)
TOTAL $ 5,622.02
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 5,310.60
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPBnn ENGINEERING
MEHORANDUM
DATE:
TO:
FROM:
RE:
6/4/96
Mike Martin, Assistant City Engineer
Matt M. Cast, Superintendent of Public Services
Development Fees for Macarthur Plaza City Garage
Lot 3 Blk. 1
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
3/4" Domestic Meter/s = 1 ESU's
3/4" Irrigation Meter/s = 1 ESU's
Fireline Meter/s = ESU's
Total
2 ESU's @ $450.00 ea = $ 900.00
100% due prior to Council approval of the final plat.
Wastewater Impact
1 - 3/4" Domestic Meter/s = 1 ESU's
Total 1 ESU's @ $450.00 ea = $450.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
2 Connections @ $50.00 each = $100.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
1. Connections ~ $50.00 each = $ 50.00
100% due prior to issuance of building permit. (Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (All Development)
1 lots @ $ 50.O0/lot = $50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 3/4" Domestic Meters @ $23.21 = $23.21
100% due prior to issuance of building permit for residential onlyo
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - 3/4" Irrigation Meter/s @ $23.21 ea
- Fireline Meter/s @ $ ea
Total $23.21
100% due prior to issuance of water meter/s.
Water Meter Deposit (Multi-F~m~ly or Non-Residential)
1 Meters @ $30.00 ea = $30.00
100% due prior to issuance of water meters.
= $23.21
= ~ $
Irrigation HeterDeposit
1 Meters @ $35.00 ea = $35.00
100% due prior to issuance of water meters.
garage
ROADWAY IMPACT FEE CALCULA'I ~ONS
PROJECT:
DATE:
MacArthur Plaza, Lot 3, Block I (City Garage)
6/17/96
ROADWAY IMPACT FEE:
Service Area *
Catel~ory **
Land Use ***
Buildinl~ Size (Sq. Ft.)
Development Units **
Vehicle Miles per Development Unit ***
Fee per Vehicle Mile
7
Commercial
Automotive Care Center
4,600
4.6
2.87
$300
Roadway Impact Fee due = (Development Units) x
iVehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $3,960.60
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Trip Generation, January 1991, ITE 5th Edition
Automobile Care Center (840)
Weekday, Peak Hour, Average Rate)