MacPlaza1 City-CS 960604DATE:
COPpRr. n ENGZNEER/NG
HE~ORANDUW
Mike Martin, E.I.T.
FROM: Ted Dutt, Interim Utilities Superintendent
RE: De ve 1 opmen t F... for
The £oilowing ~ee~
Water Impac~ t Fee:
I :/;'. /
, - / : Domestic Meter/s = ESU's
/ - ' Irrigation Meter/s = / ESU's
Total
Fireline Meter/s =__ESU's
ESU's ~ $450.00 ea $ / ,~' '
100% due prior to Council approval of the final plat.
Wastewater Impact
" ' " /
- ,~ ? ~" Domestic Meter/s = ESU's
Total / ESU's @ $450.00 ea= /S O 0'~,
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
~ Connections ~ $50.00 each
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
Connections 0 $50.00 each = $ .
100% due prior to issuance of building permit.
(RE-INSPECTIONS for Water or Wastewater $30.00)
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
lots
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
- ' / , Domestic Meters @ ~/ = $
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
I - ~/~' Irrigation Meter/s @
Fireline Meter/s ~ $ ea = $
Total ~'~ ~"'~' t
100% due prior to issuance of water meter/s.
Water Meter Deposit (Multi-Family or Non-Residential)
i Meters ~ $30.00 ea = <~ i? .7
100% due prior to issuance of water meters.
Irrigation Meter Deposit
I Meters ~ $35.00 ea
100% due prior to issuance of water meters.
For
those ~lopments having preliminary plat approval prior to June
23, 1992 the ~ng assessment is determined:
Residential L'o~ at $150.00 each =
Units (Multi family)~~.O0 each = $
50% of the amount specified ~ove s~ be paid by the Developer;
prior to Co. uncil approval, of final plat.
50% remaining shall be paid by the Builder at ~u~ time as a building
permit is issued.
Development Fees
Page 3
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
Residential Lots at $1,285.00 each = $
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Development Fees
Page 4
STREET SIGN ASSESSMENT
for
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
SIGN UNIT PRICE
No Parking $53.10
Speed Limit $63.54
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85
OTHER
QUANTITY
EXTENDED PRICE
TOTAL
Cost breakdowns may be obtained from Public Works by written
request.
DEVFEES.HLP
disk#3 form
Revised 1/22/96