Loading...
MacPlaza1 City-CS 960125DEVELOPMENT REVIEW COMMI EE ENGINEERING COMMENTS ITEM: S-1105, Ci~_ Garage Addition, zoning change from "C" (Commercial) to "C-S. U.P." (Commercial, Special Use Permit) to allow the operation of an automobile repair garage, located on the west side of MacArthur Blvd., approximately 1140' from Belt Line Road, at the request of Spiars & DeOtte, Inc. DRC DATE: January 25, 1996 and February 1, 1996 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer (304-3679) COMMENT STATUS: pt, w..~,~.~A ..~. · .. AL. ~v ~ ,/'FINAL c~cv,~tv~,~, *Note: No revisions were provided at DRC, therefore, these reflect the initial DRC comments. Site Plan 1. Provide drainage plans. 2. Show water and sewer connections and meter sizes. 3. Because of the proposed traffic patterns along the east side of this development and adjacent developments, Engineering recommends that there be no cross access on the east and that all access for the developments be from the west side off of the fire lane/common access easements. 4. The driveway and fire lane off site of the property must be built when any of the properties develop. 5. Water, sewer & Roadway impact fees will be required. 6. Show the dimension between the southern most landscape buffer and the A/C screening wall. 7. Plan should be consistent in all regards with the information submitted with the plat. Landscape Plan 1. Show brick pavers. 2. Show landscaping in buffer between mini warehouse and parking. 3. Show visibility sight triangles at all ingress/egress points. 3. Extend landscape buffers east between two properties. Same comment as Site Plan comment//3.