Loading...
WA9302-LR 960107 (4)'EOTECH N ICAL E GEE Consultants, Inc. Ei NViRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: January 7, 1996 Date Concrete Placed: December 29, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 66 Contractor: Natgun Construction Project No.: 95 -0196 Concrete Supplier and Plant: RexliMix Concrete - Plant #1 Location of Placement: Wall Panels WB1 MATERIALS s ...../ ~b ~. INSPECTION DATA Description (Lbs./Cu. Yd) Mix Number: 685 Time Sample Bateheal: 2:30 pm Cement: Time Sampled: 3:25 pm Fly Ash: Sample Location: Wall Panel WB-I Truck/Ticket No: 602/17253 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 49°F Fine Aggregate: Concrete Range: 58°F Slump Range (inches): 6" Admixtures: Weather Conditions: Partly Cloudy I Time Started: 8:00 am 2 Time Completed: 6:00 pm Added Water: 25 gal. Sample Air Content (%): 6% Total Cubic Yards Placed: 70 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Te~ted (Lbs.) (Lbs./Sq.ln.) CWT 249 6" 7 01/05/96 149,700 5,290 CWT 250 6" Hold Hold CWT 25 1 6" Hold Hold Test Methods Utilized Fracture Regular Cylindem Made By: W.I. ASTM C-31 ,C-39,C- 143 0dnlc, ss Not~t Otherwise) Remarks and/or Distribution: Note: Slumb before super plasti¢izer was 21/2" co: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendrlcks - Shimek, Jacobs and Finklea {~ Omlmltlm~, !m~ Reviewed by: ~. ~