Loading...
Lam Lee Add-LR000325 (2) CONCRETE INSPECTION AND COMPRESSION TEST REPORT Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-1532 Project 00-0'[4 Lam Lee Report Numbe 00-014.164 SPECIFICATIONS PROJECT DATA $'t-r-ength (---~-si-)~--- -- -40-0~)-~S1-~-:~8 day~s- ................. -Date of' Placement: - 3~25~00 Slump(in.): 3.5 to 5.5 Sampled by: T. Lively Air Content(%): 3-6 Weather. Overcast Concrete Temp(F): Not to exceed 90° Supplier/Mix: Pioneer / 9349 FIELD DATA SET # ]. Ticket #: 474974 Time aatched: Slump (in.): 4.5 Air Content: 4-.~ Concrete Temp(F): 67' Air Temp (F): 62° Yardage: 20 Location/Remarks: Panel - #57 SET CYLINDER DATE AGE MAX LOAD STRENGTH TEST CYLINDER NOTES NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE 01 4/1/00 7 93000 3290 1 02 4/]./00 7 95000 3360 I 03 4/22/00 28 1 04 4/22/00 28 FIELD DATA SET #2 Slump (in.): 4.5 Air Content: 4.8 Unit Weight (pc'f): N/A Concrete Temp(F): 64' Air Temp (F): 60" Yardage: 130 Location/Remarks: Panel #65 SET CYLINDER DATE AGE MAX LOAD STRENGTH TEST CYLINDER NOTES NO, NO. TESTED (days) (lbs) (psi) RESULT SOURCE 2 01 4/1/100 7 125000 4420 2 02 4/1/00 7 114000 4030 2 03 4/22/00 28 2 04 4/22/00 28 NORMAL CYLINDER SIZE: 5X12, AREA:28.27~q. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY W1TH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138. C143, C172, C231. G~'LINDERS MOLDED AND CURED SY SOILTEC'-{. ENGINEERING AND TESTING, INC, ARE PER ASTM C31, TESTED PER ASTM S.Q..ILTECH E~NGI. NE, E~NG AND TESTING, INC. / (aJa~es M. Perdue .. ~ General Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax