Lam Lee Add-LR000325 (2) CONCRETE INSPECTION AND COMPRESSION TEST REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-1532
Project 00-0'[4 Lam Lee Report Numbe 00-014.164
SPECIFICATIONS PROJECT DATA
$'t-r-ength (---~-si-)~--- -- -40-0~)-~S1-~-:~8 day~s- ................. -Date of' Placement: - 3~25~00
Slump(in.): 3.5 to 5.5 Sampled by: T. Lively
Air Content(%): 3-6 Weather. Overcast
Concrete Temp(F): Not to exceed 90° Supplier/Mix: Pioneer / 9349
FIELD DATA SET # ].
Ticket #: 474974 Time aatched:
Slump (in.): 4.5 Air Content: 4-.~
Concrete Temp(F): 67' Air Temp (F): 62° Yardage: 20
Location/Remarks: Panel - #57
SET CYLINDER DATE AGE MAX LOAD STRENGTH TEST CYLINDER NOTES
NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE
01 4/1/00 7 93000 3290
1 02 4/]./00 7 95000 3360
I 03 4/22/00 28
1 04 4/22/00 28
FIELD DATA SET #2
Slump (in.): 4.5 Air Content: 4.8 Unit Weight (pc'f): N/A
Concrete Temp(F): 64' Air Temp (F): 60" Yardage: 130
Location/Remarks: Panel #65
SET CYLINDER DATE AGE MAX LOAD STRENGTH TEST CYLINDER NOTES
NO, NO. TESTED (days) (lbs) (psi) RESULT SOURCE
2 01 4/1/100 7 125000 4420
2 02 4/1/00 7 114000 4030
2 03 4/22/00 28
2 04 4/22/00 28
NORMAL CYLINDER SIZE: 5X12, AREA:28.27~q. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY
W1TH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
ASTM STANDARDS: C138. C143, C172, C231. G~'LINDERS MOLDED AND CURED SY SOILTEC'-{. ENGINEERING AND TESTING, INC, ARE PER ASTM C31, TESTED PER ASTM
S.Q..ILTECH E~NGI. NE, E~NG AND TESTING, INC.
/ (aJa~es M. Perdue
.. ~ General Manager
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax