Lam Lee Add-LR000327 CONCRETE INSPECTION AND COMPRESSION TEST REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-].537
Project 00-014 Lam Lee Report Numbe 00-0].4.17].
SPECIFICATIONS PROJECT DATA
Strength (psi): i4000 PSI iDate of Placement: 13/27100
Slump(in.): ~,4-6 ISampled by: IJ. Andrews
iAir Content(%): iN/A Weather. IClear & Mild
'.Concrete Temp(F): Not to exceed 100° ISupplier/Mix: Piomneer / 9349
FIELD DATA SET # 1
Ticket #: 475043 iTime Batched: 12:40:00 PM iTime Sampled: 1:35:00 PM
iSlump (in.): 4.5 ~.ir Content: N/A U~-~ght (pc'f): N/A
iConcrete Temp(F): 78° !Air Temp (F): 80° ~Y~ge: 9
Location/Remarks: 'Grade beam - 100' east of southwest corner
SET CYLINDER DATE AGE MAX LOAD !STRENGTH TEST CYLINDER NOTES
NO. NO. !TESTED ~ (days) (lbs) ~. (psi) RESULT SOURCE
1 01 i 4/3/00 ' 7 118000 I 4170
1 02 14/24/00 28 144000 5090 : ,
i 03 14/24/001 28 149000 5270
1 04 i Hold
NORMAL CYLINDER SIZE: 5X12, AREk28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY
WITH PROJECT SPECIFICATIONS UNLESS INDICATED 'I~ION-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM
SO I_TECH EI . _EEP AND TESTING, INC.
':..'?. ./../
'X~,.,J~'mes M. Perdue
General Manaser
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax