Loading...
Lam Lee Add-LR000331 (2) CONCRETE INSPECTION AND COMPRESSION TEST REPORT Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00.1555 Project 00-014 Lam Lee Report Numbe 00-014.167 SPECIFICATIONS PROJECT DATA Strength (psi): 4000 PSI ~28 days iDate of Placement: 3/31100 Slump(in.): 5 !Sampled by: iC. W Air Content(%): NIA .Weather: Cloudy Concrete Temp(F): 72° [Supplier/Mix: iPioneer 19349 FIELD DATA SET # 1 Ticket #: 505512 :Time Batched: 10:50:00 AM Time Sampled: 11:35:00 AM Slump (in.): 8 iAir Content: NIA ~Unit Weight (pcf): -~o-~e-te-Temp(F): 72° !Air Temp (F): 70' Yardage: 20 Location/Remarks: Panel 32 & Top of 31 SET CYLINDER DATE AGE MAX LOAD iSTRENGTH TEST CYLINDER NOTES NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE 1 01 4/7/00 7 103000 3640 1 02 4/7/00 7 101000 3570 1 03 ;4/28/00. 28 i 04 4/28/00 28 FIELD DATA SET #2 Ticket #: 505530 !Time Batched: 12:50:00 PM 'Time Sampled: 1:35:00 PM Slump (in.): 5 iAir Content: Unit Weight (pcf): ..............................................Concrete Temp(F): 72° Air memp (F): 7'~J;--- --~-y-a-~: ........ ¥50- Location/Remarks: Panel - Top of 25 & all 24 SET CYLINDER DATE AGE MAX LOAD STRENGTH TEST CYLINDER NOTES NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE 2 01 4/7/00 7 105000 3710 2 02 4/7/00 7 106000 3750 2 03 4/28/00 28 2 04 4/28/00 28 NORMAL CYLINDER SIZE: 5X12, ARE~28.27=q. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED '%ION-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC, ANE PER ASTM C31, TESTED PER ASTM J~,,~Nmes M. Perdue General Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax