Loading...
WA9302-LR 960107 (5)"3EOTECHNICALE IGEE Consultants, Inc. E iNVlRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620~9794 R PORT OF CONCRETE MIX INSPECTION Report Date: January 7, 1996 Date Concrete Placed: December 29, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank concrete Report No.: 65 Contractor: Natgun Construction Project No.: 95 -0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Wall Panels WC 1 MATERIALS ~o~o~ ~ w~. INSPECTION DATA Description (Lbs./Cu. Yd) Mix Number: 685 Time Sample Batehed: 1:30 pm Cement: Time Sampled: 2: 30 pm Fly Ash: Sample Location: Wall Panel WC-1 Truck/Ticket No: 127/17245 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 50°F Fine Aggregate: Concrete Range: 61 °F Admixtures: Slump Range (inches): 6V2" Weather Conditions: Partly Cloudy I Time Started: 8:00 am 2 Time Completed: 6:00 pm Added Water: 45 gal. Sample Air Content (%): 6% Total Cubic Yards Placed: 60 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump Cm.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CWT 246 6%" 7 01/05/96 141,200 5,000 CWT 247 6%" Hold Hold CWT 248 6%" Hold Hold Test Methods Utilized Fracture Regular Cylinders Made By: W.I. ASTM C-31 ,C-39,C-143 (Unless Noted Otl=rwise) L-'marks and/of Distribution: Note: Slump before super plasticizer was 2~A" cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, lr. - Natgun Corporation Mr. Gary Hendricks - ShimeL Jacobs and Finklea ~ {~ammllmml~ imr_ Reviewed by; ( ~