Loading...
Lam Lee Add-LR000407 (2) CONCRETE INSPECTION AND COMPRESSION TEST REPORT Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-16!$ Project 00-0!4 Lam Lee pg ! of 2 Report Numbe 00-014.!74 SPECIFICATIONS PROJECT DATA ;Strength (psi): 4000 PSI iDate of Placement: 4/7/00 Slump(in.): 4-6 iSampled by: =LB Air Content(%): N/A !Weather. [Sunny and Warm Concrete Temp(F): Not to exceed 100° SupplierRVlix: iPioneer / 9349 FIELD DATA SET # 1 ~ Ticket #: 505752 ,Time Batched: 10:48:00 AM Time Sampled: 11:20:00 AM Slump (in.): 5 iAir Content: NIA Unit Weight (pcf): N/A ;Concrete Temp(F): 76° Air Temp (F): 70° Yardage: 10 iLocation/Remarks: Office slab (~ north east corner 10' south and 20' west SET CYLINDER DATE AGE MAX LOAD STRENGTH TEST CYLINDER NOTES NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE 1 O1 4/14/00 7 118000 4170 1 02 ' 5/5/00 28 1 03 i 5/5/00 28 I 04 Hold FIELD DATA SET #2 Ticket #: 505773 iTime Batched: 1:00:00 PM !Time Sampled: 1:35:00 PM Slump (in.): 4.5 Air Content: N/A Unit Weight (pcf): N/A Concrete Temp(F): 78° Air Temp (F): 80° Yardage: 150 Location/Remarks: Office slab - south side 10' north and 100' east of west edgef SET CYLINDER DATE AGE MAX LOAD :STRENGTH TEST CYLINDER NOTES NO. NO. TESTED (days) (lbs) (psi) RESULT SOURCE 2 O1 4/14/00 7 90000 3180 2 02 5/5/00 28 2 03 5/5/00 28 : 2 04 Hold NORMAL CYLINDER SIZE: 5X12, ARE~28.27sq. in. UNLF. SS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES, TEST RESULTS COMPLY WiTH PROJECT SPECIFICATIONS UNLESS INDICATED 'I~ON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM S(~LT~CH EI~.-~NEE~G AND TESTING, INC. k,_~'ames M. Perdue General Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax CONCRETE INSPECTION AND COMPRESSION TEST REPORT Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-1613 Project 00-014 Lam Lee pg 2 of 2 Report Numbe 00-014.174 SPECIFICATIONS PROJECT DATA Strength (psi): !4000 PSI iDate of Placement: ~4/7/00 ~Slump(in.): 4-6 iSampled by: iLB ~Air Content(%): iN/A iWeather. !Sunny and warm Concrete Temp(F): !Not to exceed 100° !Supplier/Mix: Pioneer / 9349 FIELD DATA SET #3 Ticket #: 505788 ITime Batched: 2:32:00 PM ,Time Sampled: 3:00:00 PM iSlump (in.): 4 314 iAir Content: ' N/A Unit Weight (pcf): N/A ~Concrete Temp(F): 78° iAir Temp (F): ~ 80° Yardage: 250 iLocation/Remarks: Panel - 37 SET CYLINDER DATE AGE MAX LOAD STRENGTH[ TEST CYLINDER NOTES NO. NO. i TESTED (days) (lbs) (psi) RESULT SOURCE 3 01 !4/14/00 7 97000 3430 3 02 5/5/00 28 3 03 5/5/00 28 3 04 Hold NORMAL CYLINDER SIZE: 5X12, AREA:28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM SOILTECH ENGINEERING AND TESTING, INC. James M. Perdue General Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817,595.0708 fax