Loading...
WA9302-LR 960107 (7)[EOTECHNICAL E GEE Consultants, Inc. EI NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: January 7, 1996 Date Concrete Placed: December 29, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank concrete Report No.: 63 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Wall Panels MATERIALS ~on~ ~ '~' INSPECTION DATA Description (Lbs ./Cu. Yd) Mix Number: 685 Time Sample Batched: 12:31 pm Cement: Time Sampled: 1:45 pm Fly Ash: Sample Location: Wall Panel WE-1 Truck/Ticket No: 172/17233 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 48°F Fine Aggregate: Concrete Range: 57°F Admixtures: Slump Range (inches): 71/2'' Weather Conditions: Partly Cloudy 1 Time Started: 8:00 am 2 Time Completed: 6:00 pm Added Water: Sample Air Content (%): 4% Total Cubic Yards Placed: 50 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Total Lo~d Compresslye Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CWT 240 71h" 7 01/05/96 116,440 4,120 CWT 241 71h" Hold Hold CWT 242 7~h'' Hold Hold Test Methods Utilized Frac~use Regular ASTM C-31 ,C-39,C-143 (Unless Not~l Otlgr~ig) Cylinders Made By: W.I. Remarks aml/or Distribution: Note: Slump before super plasticizer was 3" ce: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - ShimeL Jaeobs and Finklea ~1~ (~mullamts, ~ Reviewed by: ~ ~