Loading...
MacPlaza1 Speed-CS 960610The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 June 10, 1996 Ron Wilson Speedee Oil Change 15317 Midway Road Dallas, TX 75244-2112 RE: MacArthur Plaza Block 1, Lot 4 (Speedee Oil Change) Development Fee Assessment Dear Mr. Wilson: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee calculations for MacArthur Plaza Block 1, Lot 4 (Speedee Oil Change). Please make payment to the City of Coppell in the amount of $5,208.95 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official CITY OF COPPELL DEVELOPMENT FEES Date: Project: June 17, 1996 MacArthur Plaza Block 1, Lot 4 (Speedee Oil Change) TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 1,575.00 1,575.00 (100% due prior to Council Approval) Water Tap Inspection Fee 100.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee 1,125.00 1,125.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 48.30 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) 30.00 -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) 23.21 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Roadway Impact Fee 2,508.95 2,508.95 (100% due prior to Council Approval) Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0- (2% of project cost due for private improvements) contracts (4% of project cost due for public improvements) TOTAL $ 5,545.46 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 5,208.95 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL ENGINEERING HEHORANDUM DATE: June 6, 1996 TO: Mike Martin, Assistant City Engineer FROM: Matt M. Cast, Superintendent of Public Services RE: Development Fees for Macarthur Plaza Speedee Oil Chanqe Lot 4 Blk. 1 The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 1" Domestic Meter/s = 2.5 ESU's I -3/4" Irrigation Meter/s = i ESU's - Fireline Meter/s = ESU's Total 3.5 ESU's ~ $450.00 ea = $1,575.00 100% due prior to Council approval of the final plat. Wastewater Impact 1 - 1" Domestic Meter/s = 2.5 ESU~s Total 2.5 ESU's @ $450.00 ea = $1,125.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections ~ $50.00 each = $100.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 1 Connections ~ $50.00 each = $50.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots ~ $ SO.OO/lot = $50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 1" Domestic Meters @ $48.30 = $48.30 100% due prior to issuance of building permit for residential onlyo Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) Irrigation Meter/s ~ Fireline Meter/s @ $ $23.21 ea = $23.21 ea = $ Total $23.21 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) 1 Meters @ $30.00 ea = $30.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters ~ $35.00 ea = $35.00 100% due prior to issuance of water meters. speedee ROADWAY IMPACT FEE CALCULA' ,ONS PROJECT: DATE: MacArthur Plaza, Lot 4, Block 1, (Speedee Oil Change} 6/17/96 ROADWAY IMPACT FEE: Service Area * 7 Category ** Commercial Land Use *** Automobile Care Center Buildin~ Size (Sq. Ft.) Development Units Vehicle Miles per Development Unit *** Fee per Vehicle Mile 2,914 2.914 $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles Per Development Uni0 x (Fee Per Vehicle Mile) = $29508.95 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Trip Generation, January 1991, ITE 5th Edition Automobile Care Center (840) Weekday, Peak Hour, Average Rate)