Loading...
WA9302-LR 951106'EOTECHNICALE I GEE Consultants, Inc. E] NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 GENERAL REPORT Report Date November 6, 1995 Test Date: November 1, 1995 Client Natgun Corporation General Report No.: 5 Project 6.0 MG Water Storage Tank Project No.: 95-0196 IdentificationPier Inspection Method of TestVisual Observation Results Scheduled time: 7:30 am Type of service scheduled: Time left lab: 7:00 am Time arrived at job: 7:20 am Time left job: 9:30 am Time returned lab: 9:45 am Total Charged Time: 2.75 hrs. Reason: Ground surface was too wet, concrete can not move. Technician: P.Chen cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - ShimeL Jacobs and Finklea