WA9302-LR 951106'EOTECHNICALE I GEE Consultants, Inc.
E] NVIRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794
GENERAL REPORT
Report Date November 6, 1995 Test Date: November 1, 1995
Client Natgun Corporation General Report No.: 5
Project 6.0 MG Water Storage Tank Project No.: 95-0196
IdentificationPier Inspection
Method of TestVisual Observation
Results
Scheduled time: 7:30 am
Type of service scheduled:
Time left lab: 7:00 am
Time arrived at job: 7:20 am
Time left job: 9:30 am
Time returned lab: 9:45 am
Total Charged Time: 2.75 hrs.
Reason: Ground surface was too wet, concrete can not move.
Technician: P.Chen
cc: Mr. Larry Davis - City of Coppell
Mr. Bob Barbarisi, Jr. - Natgun Corporation
Mr. Gary Hendricks - ShimeL Jacobs and Finklea