Loading...
Lam Lee Add-LR000510 CONCRETE INSPECTION AND COMPRESSION TE T REPORT Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-1741 Project 00-014 Lam Lee Report Nurnbe 00-014.185 SPECIFICATIONS PROJECT DATA Strength (psi): ~i4000 PSI @ 28 days Date of Placement: i5/10/00 iSlump(in.): i4_6 Sampled by: !LB iAir Content(%): iNIA Weather: Overcast / Warm !Concrete Temp(F): !Not to exceed 100° Supplier/Mix: !Pioneer / 9351 I FIELD DATA SET # 1 Ticket #: 507856 [Time Batched: ! 11:30:00 AM .Time Sampled: 12:00:00 PM Slump (in.): 5 Air Content: I. NIA I:Unit Weight (pcf): N/A 'Concrete Temp(F): 78° [Air Temp (F): 80° iYardage: ; 10 [ · IRetaining wall .~Locatlon/Remarks: ~ at Northwest corner of building. ' SET CYLINDER DATE : AGE MAX LOAD ~,STRENGTH TEST CYLINDER NOTES NO. NO. TESTED (days) (lbs) i (psi) RESULT SOURCE 1 O1 5/17/00 7 98000 3470 ..................... 1 02 , 6/7/00 ' 28 ~ I : 03 i6/7/00 28 ! I, t Ii 04 ! i Hold I [ ~ NORMAL CYLINDER SIZE: 5X12, AREA:28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLI~II~RS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM N.l.~es M. Perdue General Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax