Lam Lee Add-LR000510 CONCRETE INSPECTION AND COMPRESSION TE T REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-1741
Project 00-014 Lam Lee Report Nurnbe 00-014.185
SPECIFICATIONS PROJECT DATA
Strength (psi): ~i4000 PSI @ 28 days Date of Placement: i5/10/00
iSlump(in.): i4_6 Sampled by: !LB
iAir Content(%): iNIA Weather: Overcast / Warm
!Concrete Temp(F): !Not to exceed 100° Supplier/Mix: !Pioneer / 9351
I
FIELD DATA SET # 1
Ticket #: 507856 [Time Batched: ! 11:30:00 AM .Time Sampled: 12:00:00 PM
Slump (in.): 5 Air Content: I. NIA I:Unit Weight (pcf): N/A
'Concrete Temp(F): 78° [Air Temp (F): 80° iYardage: ; 10
[ · IRetaining wall
.~Locatlon/Remarks: ~ at Northwest corner of building.
' SET CYLINDER DATE : AGE MAX LOAD ~,STRENGTH TEST CYLINDER NOTES
NO. NO. TESTED (days) (lbs) i (psi) RESULT SOURCE
1 O1 5/17/00 7 98000 3470 .....................
1 02 , 6/7/00 ' 28 ~
I : 03 i6/7/00 28 ! I,
t Ii 04 ! i Hold I [ ~
NORMAL CYLINDER SIZE: 5X12, AREA:28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY
WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
ASTM STANDARDS: C138, C143, C172, C231. CYLI~II~RS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM
N.l.~es M. Perdue
General Manager
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax