Lam Lee Add-LR000510 (2) CONCRETE INSPEC rlON AND COMPRESSION TEST REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Nurnbe 00-1741
Project 00-014 Lam Lee Report Numbe 00-014.3.85
SPECIFICATIONS ! PROJECT DATA
Strength (psi): i4000 PSi ~ 28 days Date of Placement: 5/10/00
Slump(in.): !~//A Sampled by: Lo~Bercast / Warm
~Air Content(%): i Weather.
!Concrete Temp(F): Not to exceed 100° ~,Supplier/Mix'i .Pioneer / 9351
FIELD DATA SET # 1
Ticket #: 507856 ITime Batched: : 11:30:00 AM Time Sampled: 12:00:00 PM
,Slump (in.): i 5 lAir Content: ! NIA !Unit ~-~ght (pcf): ! NIA
I I. Yardage:
iConcrete Temp(F): Retaining 78° ~ir Temp (F): 80' i 10
I, Location/Remarks: W. all at Northwest comer of building.
SETI CYLINDER DATE ! AGE MAX LOAD STRENGTH TEST I CYLINDER i NOTES
NO. ! NO. TESTED! (days) (lbs) (psi) RESULT ~ SOURCE
I 01 15/17/00 7 98000 3470 I
1 i 02 [6/7/00 28 ~ 122000 4320 i
1; 03 6/7/00 28 131000 4630
]' i 04 I Hold I :
NORMAL CYLINDER SIZE: 5X12, AREAc28.27sq. in. UNLESS NOTED HERE: TYPE "A' CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY
WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLiANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC, ARE PER APPLICABLE
ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM
SOILTECH ENGINEERING AND TESTING, INC.
f~neral Manager
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax