Loading...
MacPlaza 4-CS 980106 Re. Box 478 Coppeil, Texas 75019 - 972-4~2-0022 The City With A Beautiful Future PO BOX 478 COPPELL, TEXAS 75019 January 6, 1998 Wade Walker Graham Associates, Inc. 616 Six Flags Drive, Suite 400 Arlington, TX 76011 RE: MacArthur Plaza Addition, Lot 4, Block 1 (Upper Image Carwash) Development Fee Assessment Dear Mr Walker: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $13,320.14 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beghaning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Director of Engineering & Public Work cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: MacArthur Plaza Addition, Lot 4, Block 1 (Upper Image Carwash) Date: 1/6/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,725.00 $4,725.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $100.00 (100 % due at Issuance of Water Meter) Water Meter Fee (Domestic) $195.98 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) '. $57.75 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $4,995.14 $4,995.14 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $13,838.87 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $13,320.14 DEVELOPMENT FEE WORKSHEET PROJECT: MacArthur Plaza Addition, Lot 4, Block 1 (Upper Image Carwash) DATE: 1/6/98 Water Impact Fee: Domestic Meter(s): 1 - 2 inch 8 ESU's Irrigation Meter(s): I - I inch 2.5 ESU's ESU's Fireline Meter(s): ESU's Total #: 10.5 ESU's @ $450.00 ea. $4,725.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. ' $100.00 (.Single family due prior to issuance of building permit) (All other developments due 'prior to issuance of meter) Water Meter Fee (Domestic): Total #: I Domestic Meter(s) @ $195.98 $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ $57.75 $57.75 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: I Meter(s) @ $35.00 ea. $35.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 8 @ $450.00 ea. $3,600.00 Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ail developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 3 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot N/A N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $4,995.14 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development con~ac~s The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 4 ROADWAY IMPACT FEE CALCULATIONS PROJECT: MacArthur Plaza Addition, Lot 4, Block 1 (Upper Image Carwash) DATE: 1/6/98 ROADWAY IMPACT FEE: Service Area * 7 Category ** Commercial Land Use ** Others / Not Specified (Commercial) Building Size (Sq. Ft.) 3,498 Development Units ** 3.498 Vehicle Miles per Developmem Unit ** 4.76 Fee per Vehicle Mile *** $300 IRoadway Impact Fee due = (Development Units) x ' (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $4,995.14 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) · ** (Schedule 2, Page 3 - Roadway Impact Fee Study)