Loading...
Lam Lee Add-LR000524 CONCRETE INSPECTION AND COMPRESSION TEST REPORT Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00.1857 Project 00-014 Lam Lee Pg ]' of 2 Report Numbe 00-014.210 PROJECT DATA SPECIFICATIONS Strength (psi): [3000 PSI ~. 28 days iDate of Placement: 5124100 i Sampled by: iSlump(in.): 14.6 iAir Content(%): lWeather. Warm / Humid / Dark / Breezy :oAt to Supplier/Mix: IConcrete Temp(F): exceed 100° [Pioneer / 9327 FIELD DATA SET # 1 iTicket #: 508329 iTime Batched: ! 4:15:00 AM ITime Sampled: i; 5:20:00 AM ISlump (in.): 6 !Air Content: ! N/A IUnit Weight (pct'): [ N/A IConcrete Temp(F): 74* [Air Temp (F): 75° IYardage: i 90 '=Location/Remarks:, 40' North and 250' east of northwest corner north side of building r SET CYLINDER DATE i AGE i MAX LOAD iSTRENGTHI TEST i CYLINDER NOTES i NO. NO. !TESTEDI (days) (lbs) (psi) i RESULT II SOURCE , ! 1 O1 ;5/31/00! 7 102000 3610 ~, ! ' 1 02 [6/21/00 28 ~ 1 03 i6/21/00i 28 [ 1 04 , [ Hold [ FIELD DATA SET # 2 iTicket ~: 508334 !Time Batched: ~ 4:49:00 AM ITime Sampled: I 6:00:00 AM , !Slump (in.): 6 ir Content: ! N/A Unit Weight (pc'f): ',Concrete Temp(F): 74° !Air Temp (F): ! 78' [Yardage: i 140 [Location/Remarks: 40' north and 150' east of northwest comer north side building SET CYLINDER i DATE [ AGE I MAX LOAD ~STRENGTHI TEST CYLINDER i NOTES i NO. NO. I TESTED (days) (lbs) (psi) RESULT SOURCE 2 01 i5/31/001 7 105000 3710 2 02 !6/21/001 28 2 03 !6/21/00= 28 2 04 Hold NORMAL CYLINDER SIZE: 5X12, AREA:28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM SO LT CH ERG E TESTING, INC. X~'rnes M. Perdue General Manager 2502 Gravel Drive · Fort Worth, Texas 76118. 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax CONCRETE INSPECTION AND COMPRESSION TEST REPORT Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-1857 Project 00-014 Lam Lee pg 2 of 2 Report Numbe 00-014.210 I PROJECT DATA SPECIFICATIONS Strength (psi): 3000 PSI ~ 28 days Date of Placement: 15/24/00 [Slump(in.): 14-6 Sampled by: ITIST / LB i!Air Content(%): iN/A I~eather: !Dark / Humid/Warm / Breezy !Concrete Temp(F): iNot to exceed 100° FIELD DATA SET Ticket #: 508346 iTime Batched: ! 6:53:00 AM iTime Sampled: i 7:30:00 AM Slump (in.): 41& Air Content: NIA IUnit~ Weight (pcf): I N/A ~,Concrete Temp(F): i: 76' lair Temp (F): 79° Yardage: / 250 iLocation/Remarks: i70' west of building 150' south of northwest corner SET CYLINDER i DATE 'i AGE I MAX LOAD !STRENGTH TEST CYLINDER NOTES NO. NO. TESTEDI (days) ~, (lbs) (psi) RESULT SOURCE 3 01 15/31/00 7 ! 54000 1910 3 Ol !6/21/ooI 28 I 3 03 6/21/00 28 ! = 3 04. I I Hold i FIELD DATA SET # Ticket #: ITime Batched: ! ITime Sampled: IUnit Weight (pet): Slump (in.): lAir Content: ;Concrete Temp(F): !Air Temp (F): Location/Remarks: NORMAL CYLINDER SIZE: 5X12, AREA:28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY W1TH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM SOILTECH ENGINEERING AND TESTING, INC. James M. Perdue General Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax