Lam Lee Add-LR000524 CONCRETE INSPECTION AND COMPRESSION TEST REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00.1857
Project 00-014 Lam Lee Pg ]' of 2 Report Numbe 00-014.210
PROJECT DATA
SPECIFICATIONS
Strength (psi): [3000 PSI ~. 28 days iDate of Placement: 5124100
i Sampled by:
iSlump(in.): 14.6
iAir Content(%): lWeather. Warm / Humid / Dark / Breezy
:oAt to Supplier/Mix:
IConcrete Temp(F): exceed 100° [Pioneer / 9327
FIELD DATA SET # 1
iTicket #: 508329 iTime Batched: ! 4:15:00 AM ITime Sampled: i; 5:20:00 AM
ISlump (in.): 6 !Air Content: ! N/A IUnit Weight (pct'): [ N/A
IConcrete Temp(F): 74* [Air Temp (F): 75° IYardage: i 90
'=Location/Remarks:, 40' North and 250' east of northwest corner north side of building
r SET CYLINDER DATE i AGE i MAX LOAD iSTRENGTHI TEST i CYLINDER NOTES
i NO. NO. !TESTEDI (days) (lbs) (psi) i RESULT II SOURCE ,
! 1 O1 ;5/31/00! 7 102000 3610 ~, !
' 1 02 [6/21/00 28
~ 1 03 i6/21/00i 28
[ 1 04 , [ Hold
[ FIELD DATA SET # 2
iTicket ~: 508334 !Time Batched: ~ 4:49:00 AM ITime Sampled: I 6:00:00 AM ,
!Slump (in.): 6 ir Content: ! N/A Unit Weight (pc'f):
',Concrete Temp(F): 74° !Air Temp (F): ! 78' [Yardage: i 140
[Location/Remarks: 40' north and 150' east of northwest comer north side building
SET CYLINDER i DATE [ AGE I MAX LOAD ~STRENGTHI TEST CYLINDER i NOTES
i NO. NO. I TESTED (days) (lbs) (psi) RESULT SOURCE
2 01 i5/31/001 7 105000 3710
2 02 !6/21/001 28
2 03 !6/21/00= 28
2 04 Hold
NORMAL CYLINDER SIZE: 5X12, AREA:28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY
WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM
SO LT CH ERG E TESTING, INC.
X~'rnes M. Perdue
General Manager
2502 Gravel Drive · Fort Worth, Texas 76118. 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
Client Alice Lee c/oRealty Capital Corporation Work Order Numbe 00-1857
Project 00-014 Lam Lee pg 2 of 2 Report Numbe 00-014.210
I PROJECT DATA
SPECIFICATIONS
Strength (psi): 3000 PSI ~ 28 days Date of Placement: 15/24/00
[Slump(in.): 14-6 Sampled by: ITIST / LB
i!Air Content(%): iN/A I~eather: !Dark / Humid/Warm / Breezy
!Concrete Temp(F): iNot to exceed 100°
FIELD DATA SET
Ticket #: 508346 iTime Batched: ! 6:53:00 AM iTime Sampled: i 7:30:00 AM
Slump (in.): 41& Air Content: NIA IUnit~ Weight (pcf): I N/A
~,Concrete Temp(F): i: 76' lair Temp (F): 79° Yardage: / 250
iLocation/Remarks: i70' west of building 150' south of northwest corner
SET CYLINDER i DATE 'i AGE I MAX LOAD !STRENGTH TEST CYLINDER NOTES
NO. NO. TESTEDI (days) ~, (lbs) (psi) RESULT SOURCE
3 01 15/31/00 7 ! 54000 1910
3 Ol !6/21/ooI 28 I
3 03 6/21/00 28 ! =
3 04. I I Hold i
FIELD DATA SET #
Ticket #: ITime Batched: ! ITime Sampled:
IUnit Weight (pet):
Slump (in.): lAir Content:
;Concrete Temp(F): !Air Temp (F):
Location/Remarks:
NORMAL CYLINDER SIZE: 5X12, AREA:28.27sq. in. UNLESS NOTED HERE: TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. TEST RESULTS COMPLY
W1TH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE
ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM
SOILTECH ENGINEERING AND TESTING, INC.
James M. Perdue
General Manager
2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax